Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T17CM09407
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/26/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
03/02/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Revise the window general notes #3 and #4 on sheet A5.1 to read "maximum" U-factor. [Initial comment: Provide calculations (e.g. COMcheck) for the building envelope to demonstrate compliance with the energy code; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. As a minimum, the information shall include maximum U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the maximum SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012.] |
03/02/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Comment not addressed by the architect. [Initial comment: Provide dimensions for the "thru-wall sheet metal scupper(s)" described in keynote 10 on sheet A2.3. Show how secondary drainage will be provided or present structural calculations per Section 1101.7, IPC 2012. Reference: Section 1108.1, IPC 2012] |
03/07/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T17CM09407 - New Building (Food Service) Building Plan Review (2nd Review) Starbucks Coffee Shop 203 E Speedway Boulevard TRANSMITTAL DATE: March 7, 2018 DUE DATE: March 9, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has done a second review of the building plans and compared them to the approved DP17-0266 for consistency. While the review did yield an indication that the building plans are consistent with what has been proposed and drawn on the DP two items were noted on the architectural site plan that do not match what was approved on the DP. The locations of the long and short term bicycle parking facilities are not consistent with the locations depicted on the architectural site plan. Either the architectural site plan must be revised to match the DP or visa-versa. While the building footprint is consistent with the footprint on the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc.) zoning cannot approve the building plans until the Commercial Plans reviewer(s) have approved the building plans. 2. COMMENT: Zoning will review the building plans on the next submittal to assure consistency with the approved DP. If any changes are necessary to the building plans due to plan review comments that affect zoning requirements the DP will have to be revised to reflect the changes. Once zoning has verified consistency with the approved DP or if required a revised and approved DP and the building plans are approved by the Commercial Plans reviewers zoning can approve the building plans. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/04/2018 | QJONES1 | APPROVAL SHELF | Completed |
04/04/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
04/04/2018 | QJONES1 | REJECT SHELF | Completed |