Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM09404
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/08/2018 | ALEXANDRA HINES | ZONING | REVIEW | Approved | |
| 01/08/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating/cooling load calculations for DHP-1 through DHP-4. 2. Provide efficiency specifications for the rooftop units being installed. 3. Verify the air flow rate specifications for EF-2, EF-3, and EF-4. 4. Provide heating/cooling load calculations for HP-1 and HP-2. |
| 01/08/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide a lighting control detail or clarify how the lighting circuits for the 30 and 40 amp circuits are to be distributed along the luminaires. #2. Panel 'E' panel schedule shows the bus rating at 200 amps and main lugs at 100 amps. Please clarify. #3. Provide a grounding detail for the new 100 KVA transformer. #4. Provide power information on the electrical plans for the exhaust fans. Verify that they are rated at 1 HP. Ref; 2012 IBC section 107.2.1, 2011 NEC |
| 01/08/2018 | AHINES2 | ENGINEERING | REVIEW | Passed | |
| 01/08/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide metering faucets for the new lavatories that dispense no more than 0.25 gallons per metering cycle. the cycle shall be at least 10-seconds for accessibility. 2. Provide tempered water for the new lavatories using mixing valves that are listed to ASSE 1070. The maximum temperature shall be 110 degrees Fahrenheit. 3. Provide specifications for the proposed water heater. |
| 01/08/2018 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Provide the size of the existing water meter and its serial number. 2. What will be the demand served by the water meter? 3. Is there a reduced pressure principle backflow preventer (RP) at the meter? What is its size? |
| 01/10/2018 | ARUIZ1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
| 01/10/2018 | ARUIZ1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 12/22/2017 | JVINCEN1 | FIRE | REVIEW | Approved |