Permit Number: T17CM08928
Parcel: 12606204A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T17CM08928
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/10/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet TS1; Code Study (Area): Since this is a tenant improvement with no change of use and no new square footage being added, and the tenant improvement is for a portion of the existing building, the allowable area and allowable height calculations are not required. This would have been established when the entire building was originally permitted. The "Allowable Area " calculation under "Code Study" and under the "Code Analysis Data" may be removed.
2. Sheet TS1; Code Study (Fire Protection): A shaft enclosure indicates a two hour fire resistance rating per the IBC Section 713.4 when connecting four or more stories, and not less than one hour rating where connecting less than four stories. This note on the drawings may be changed.
3. Sheet A0.1: Why is there no exit plan for the second floor included on this sheet? Is the note in the Legend indicating the exiting plan does not change from the existing? Please clarify.
4. Sheet A0.1; Basement Exit Plan: The plan indicates 81 occupants (41 + 40), while Sheet TS1 indicates 83 occupants. Please revise.
5. Sheet A0.1; Ground Floor Exit Plan: The plan indicates 125 occupants (50 + 38 + 37), while Sheet TS1 indicates 117 occupants. Please revise.
6. Sheet A0.1; Plans: Please add north arrows to the plans.
7. Sheet D1; Floor Plan: Please add the verbiage 'Basement Demolition' to the plan title under the plan.
8. Sheet D1.1; Floor Plans: Please add the verbiage 'Ground Floor Demolition' to the plan title under the plans.
9. Sheet D1.2; Floor Plans: Please add the verbiage 'Demolition' to the plan title under the plans.
10. Sheet A1; Partition Types: On Type 6C, reference is made to Details 6 and 7 on Sheet A4. Please revise the detail references.
11. Sheets A1 and A1.2; Partition Types: Please indicate partition Type E in a few locations on the plans.
12. Sheets A1 and A1.2; Floor Plan: Is the new elevator to be accessible? Please verify, and if it is an accessible means of egress, please indicate on the drawings the requirements of the IBC Section 1007.4 are met.
13. Sheets A1, A1.2, A1.3, A3, and A6; Key Notes: Note 10.1 references Section 4.30 for an accessibility sign guideline. Please revise the reference.
14. Sheets A1, A1.2, and A1.3; Partition Types: On Type 6D, reference is made to Section 8/A4. Please revise the section reference.
15. Sheet A1.2; First Floor Key Plan: The two areas with enlarged plan references indicate 2/A1.1 and 3/A1.1. Please revise the references.
16. Sheet A1.3; Second Level Floor Plan: Please indicate the new partition walls on this plan at the new elevator.
17. Sheet A1.3; Second Floor Key Plan: The two areas with enlarged plan references indicate 2/A1.2 and 3/A1.2. Please revise the references.
18. Sheet A2; Floor Plan: Please add the verbiage 'Basement Reflected Ceiling' to the plan title under the plan.
19. Sheet A2.1; First Floor Plan: Please add the verbiage 'Reflected Ceiling' to the plan title under the plan.
20. Sheet A2.1; Key Plan: One enlarged reference indicates3/A2.1. Please revise the reference.
21. Sheet A2.2; Floor Plan: Please add the verbiage 'Second Floor Reflected Ceiling' to the plan title under the plan.
22. Sheet A4; Wall Type 4C: The enlarged detail reference should indicate 3A/A4. Please revise.
23. Sheet S2.0; Foundation Plan: Please indicate the elevator sump pit on the plan, or reference a plan for that information.
24. Sheet S5.0; Detail 206: A note indicates "for size, type and number of bolts, see typical bolt schedule'. Is there a bolt schedule on these drawings? Please verify.
25. Structural Calculations; Sheet 1: A beam DB3 indicates a W12x19 minimum beam is required. Where is this beam located? Please verify.
26. General: Please indicate on the drawings the requirements for penetrations through fire resistance rated wall/floor systems per the IBC Section 714 are met.
27. General: Please indicate on the drawings the requirements for fire resistant joint systems through fire resistance rated wall/floor systems per the IBC Section 715 are met.
28. General: Please indicate on the drawings the requirements for opening protectives through fire resistance rated wall/floor systems per the IBC Section 716 are met.
29. General: Please indicate on the drawings the requirements for ducts and air transfer openings through fire resistance rated wall/floor systems per the IBC Section 717 are met.
30. General: Please provide written responses to all review comments.
01/10/2018 ROBERT SHERRY WATER REVIEW Completed
01/10/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Correct the north arrows for the floor plans on sheet P1.0. Reference: Section 107.2.1, IBC 2012.
2. Clarify keynote 4 on detail 1/P3.1: the note calls for the air injection connection to be "above 2" ball valve" but the connection is shown above the check valve and below the ball valve. Reference: Section 107.2.1, IBC 2012.
01/10/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
01/10/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Clarify how the balancing contractor will be able to ensure the correct amount of outside air will be delivered to the various areas based on your calculations. Reference: Section 403.6, IMC 2012.
2. The ventilation calculations for the basement indicate a required exhaust flow rate of 2413 CFM but the mechanical plan identifies 4920 CFM of exhaust for the basement area. How will the space be maintained at an essentially neutal pressure? Reference: Section 501.4, IMC 2012.
12/22/2017 JVINCEN1 FIRE REVIEW Approved