Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T17CM08717
Parcel: 110053390

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T17CM08717
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/04/2017 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T17CM08717
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide two sets of updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2012 International Residential Code and 2012 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

SECTIONS - DETAILS:

1. Revise cross-section detail #2/S1.0. Show the minimum 12" footing depth below the undisturbed ground surface (R403.1) with 12" minimum width for wood framed walls R403.1.1, and with #4 (top & bottom) continuous reinforcement rebar. Show exterior wood sheathing and wall framing with a 6" clearance above the ground R317.1 item 5, or 2" above concrete walkways.
2. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing (closed cell spray or rigid board tight to the roof sheathing), R806.5. This condensation control provision is necessary for code compliance, and may be a single layer of air-impermeable insulation, or layered with batt insulation for achieving the total required roof R-value of R-38, N1102.1. Update keynote #6/A3.0.

MECHANICAL PLANS:

1. Provide demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D. Notate if the mechanical system calculations may be provided by deferred submittal. The deferred calculations must be approved through revision process prior to mechanical inspections.
2. Show bathroom exhaust fan locations with minimum 50 CFM rating and duct to the exterior, R303.3 and M1507.4.

ELECTRICAL PLANS:

1. Show the sub-panel B feeder conductor size with a rating not less than the over-current protection (breaker size at circuit #40/42), E3705.5. The #2 wire (shown on riser diag.) requires a maximum 115A breaker, or a #1/0 wire requires a maximum 150A breaker.
2. Hallways of 10' or more in length require a receptacle, E3901.10.

If you have any questions please contact:
Ken Van Karsen
(520) 837-4912
City of Tucson Residential Plan Review