Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T17CM08657
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/06/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not resolved; no civil plans provided. [Initial comment: Provide a site drawing showing the size, route, and slope of the building sewer and the location of its connection to the public sewer. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Reference: Section 107.2.1, IBC 2012.] 2. See detail 5/P0.2. [Initial comment: Detail 4/P0.2 shows a thermostatic mixing valve (TMV) installed at the water heater. Provide a specification for this valve. Reference: Section107.2.1, IBC 2012.] 3. The bottle filler mentioned in the response to the comments is not included in the drinking fountain specification. If the bottle filler is to substitute for the second drinking fountain, cups must be provided at an accessible location. [Initial comment: Provide at least two drinking fountains for this building per Sections 1109.5 and 2902.1, IBC 2012 and Section 410.2, IPC 2012.] 4. The water pressure calculations have not been updated to include the water pressure booster pump. [Initial comment: Per Tucson Water, the water pressure range for this address is expected to be 41 to 48 PSI. Verify the pressure range with Tucson Water (contact: Ray Munoz at 520-837-2207) and revise the water pressure calculations as needed. Reference: Section 604.6, IPC 2012.] 5. The water pressure calculations have not been updated. [Initial comment: The minimum flow pressure for the specified water closet, drinking fountain, thermostatic mixing valve (TMV-1), and the mop sink faucet is 20 PSI. Revise the design criteria of the water distribution system to provide a flow pressure of 20 PSI as prescribed by the fixture or appliance manufacturer. Reference: Section 604.3, IPC 2012, as amended by the City of Tucson.] 6. Tempered water is defined as being less the 110 degrees Fahrenheit. Revise the water heater detail to show hot water being supplied from the water heater. [Initial comment: The water heater entry in the Plumbing Equipment Schedule calls for both 110 degrees Fahrenheit maximum temperature and an outlet temperature of 125degrees Fahrenheit. Clarify the operating conditions for the water heater. The minimum hot water inlet temperature for TMV-1 is 120 degrees Fahrenheit. In addition, hot water (defined as being greater than or equal to 110 degrees Fahrenheit), is required for the service sink and the mop sink. Reference: Section 607.1, IPC 2012.] 7. Comment not addressed. [Initial comment: The developed length of the hot water supply piping from the water heater to the hose bibb appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2012.] 8. The non-potable water faucet will require a backflow preventer prior to the faucet. [Initial comment: The specifications for the service sink faucet (Cambridge 28T9) indicate that the faucet is "Not for potable water." Provide non-potable water signage per Section 608.8, IPC 2012.] |
03/06/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
03/09/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Per COMcheck, "Continuous insulation is insulation that is continuous over framing members or furring strips and is free of significant thermal bridging." The proposed insulation in the exterior walls is not continuous but is cavity insulation. Revise the COMcheck input or revise the wall construction. [Initial comment: Show how R-5.7 continuous insulation (i.e. no parallel thermal paths) is being obtained using batt insulation between z-furring channels for the exterior walls. Reference: Section C402.1.1, IECC 2012.] 2. Specify that the fenestration be NFRC-certified, not just the doors. [Initial comment: Specify that the required U-factors and Solar Heat Gain Coefficients (SHGC) for the fenestration and doors shall be NFRC-certified. Reference: Section C103.2, IECC 2012.] |
03/16/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
03/23/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
03/27/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Two sets of the structural calculations were not included in this submittal. Please provide. |
03/28/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: David Rivera for Steve Shields - Principal Planner PDSD Zoning Review Section PROJECT: Uhaul - 1265 E. Benson Hy. T17CM08657 Building Plan (2nd Review) TRANSMITTAL DATE: March 28, 2018 1. Zoning has reviewed the building plans for compliance with development package (DP) DP16-0156 and the building plans match the DP but until all other PDSD review agencies have approved the building plans zoning cannot approve. 2. The Development Package DP16-0156 has been approved by review staff. The plans are ready for pick up and there is still an outstanding review fee of $536.90 that needs to be paid before teh DP plans can be released. Also until the DP fees are paid and the Dp plans pulled zoning cannot approve the building plans. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |