Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T17CM08581
Parcel: 12310001A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T17CM08581
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/17/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
11/17/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
11/28/2017 MARTIN BROWN FIRE REVIEW Approved
12/07/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. General Sheets; G0.5 and G0.6: These sheets are not listed on the Sheet G0.1 Drawing Inventory. Please clarify.
Should Sheets G0.5 and G0.6 be inserted to Sheet G0.1?
2. Sheet A0.4; Second Level Plan: The IR LAB 3 (0250803) has an enlarged plan reference 1/A7.2.11. Please revise that reference.
3. Sheet A2.2.0; Second Level Plan: In the IR LAB 3 (0250803), hatching has been indicated. Please add a Graphic Legend to this sheet indicating the description of that hatching.
4. Sheet A2.2.3D; Second Level Plan: In the CATH LAB 2 (0250902), please adjust the room title so it is legible.
5. Sheet A3.2.3; Second Level Plan: In the CATH LAB 1 and 2 (0250901 and 0250902), please adjust the room titles so they are legible.
6. Sheet A3.2.4; Second Level Plan: Please add the room titles to EP1 and EP2.
7. Sheet A7.2.12B; Enlarged Plans 1 and 2: Hatching has been indicated on these plans. Please add a Graphic Legend to this sheet indicating the description of that hatching.
8. Sheet A7.3.4: This sheet was included in the submittal set, but was not indicated on the Itemized List. Please verify.
9. Sheet AQ2.2.4D; Second Level Plan: Hatching has been indicated on these plans. Please add a Graphic Legend to this sheet indicating the description of that hatching.
10. General: Please provide written responses to all review comments.
12/15/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change BANNER MODALITIES ROUND 3 COMMENTS
Please address the following electrical plan review comments. Also provide a written response.
#1. Provide revised IECC Energy Code Compliance for the added lighting.
#2. Plan sheet E7.0.1 (Details) shown on itemized list, not included in the plan set.
#3. What do the hexagon symbols with letters inside represent, shown in the enlarged electrical floor plans? Provide a complete symbol legend and a equipment schedule.
#4. Provide complete panel schedules for all the panels associated with the circuiting of all the equipment and devices shown on the enlarged power and lighting plans.
Ref; 2012 IBC sec 107.2.1, 2011 NEC

Final Status

Task End Date Reviewer's Name Type of Review Description
01/19/2018 TWEIDEM1 APPROVAL SHELF Completed
01/19/2018 TWEIDEM1 OUT TO CUSTOMER Completed
01/19/2018 TWEIDEM1 REJECT SHELF Completed