Permit Number: T17CM08572
Parcel: 12310001A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T17CM08572
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/16/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. MG2.2.4: How does the location of the two zone valve boxes (ZVB-2-23 and ZVB-2-31) comply with Section 5.1.4.6.7, NFPA 99-2015?
2. P3.1.3: Clarify the layout of the new waste and vent piping, e.g. finish labeling the pipes and provide a waste and vent isometric. Reference: Section 107.2.1, IBC 2012.
11/16/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
11/28/2017 MARTIN BROWN FIRE REVIEW Approved
11/29/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Please provide a feeder schedule with the one line diagrams.
#2. Could not locate a panel schedule for panel '4NAAH-S1', and '4IAAH-S2'.
#3. Ref; one line diagrams.
(a) Shows the feeders and connection to 225 amp panel labeled 'CT2' via panel '2IAAH-S2'. Also shown is another 400 amp panel also labeled 'CT2' connected to panel '4IAAH-S1', the panel schedule for '2IAAH-S2' does not show panel 'CT2', or load calcs for either panel. The panel schedule for panel 'CT2' shows that it is fed from panel '4IAAH-S1'. Please clarify.
(b) The one line diagram also shows feeders and connections to 150 amp panel 'CT3' via panel '2IAAH-S1'. The panel schedule for '2IAAH-S1' does not show the load calcs for all the individual equipment, including 'CT3' or the panel '2IAAH-S1'. Please address this, or clarify.
(c) Could not locate a panel schedule for 'CT3'.
(d) Shows feeders and connections to 'RAD1' and 'RAD2' via panel '2CAAH-S1'. The panel schedule for '2CAAH-S1' only shows 'RAD2' clouded. What about 'RAD1'. Please clarify.
#4. Ref; Plan Sheet E9.2.4.
(a) The panel schedule for '2NAAH2' shows X-Ray equipment on Circuit 7-9-11 room # 0250303, in the clouded area (Delta 183). Could not locate this equipment on the enlarged electrical power plan sheet E8.2.3 or floor plans. Please clarify.
(b) The panel schedule for '2NAAH1' does not show the OCPD designation or load calcs for 'SCT3'.

#5. Could not locate panel schedule for panel 'SCT3'.
#6. What is the scope of work for the clouded area (Delta 183) on plan sheet E3.2.2? This was not addressed in the Itemized List.
#7. What is the scope of work on plan sheet E3.2.3? Also not addressed in the Itemized List.
#8. What is the scope of work on plan sheet E4.2.2? Also not addressed in the Itemized List.
#9. What is the scope of work on plan sheet E4.2.3? Also not addressed in the Itemized List.
#10. What is the scope of work on plan sheet E6.2.2? Also not addressed in the Itemized List.
#11. What is the scope of work on plan sheet E6.2.3? Also not addressed in the Itemized List.
#12. Please clarify what "Added Modality Services" means in the Itemized List E8.2.1 thru E8.2.7.
Due to the deficiencies and or clarification needed in the electrical plans, a complete plan review was not possible. Please be advised that additional comments may be generated at to subsequent review.
Ref; 2012 IBC sec 107.2.1, 2011 NEC.
Dan.santacruz@tucsonaz.gov
12/01/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. General Sheets; G0.6: There is no Sheet G0.6 in this submittal set, and no Sheet G0.6 listed on the drawing inventory Sheet G0.1. Please clarify.
2. Sheet A0.4; Second Level: A revised detail callout at R/F 0250104 was not located. The enlarged plan 1/A7.2.2 was not in this submittal set. Please clarify.
3. Sheet A0.4; Second Level: The revision indicates removing shielding at the NUC MED HOT LAB and INJECTION rooms. Where are these rooms located on this plan? Please clarify.
4. Sheet A0.4; Second Level: The revision indicates removing shielding at both Multi-Procedure rooms. Where are these rooms located on this plan? Please clarify.
5. Sheet A2.2.0; Second Level: Please define 'No Fly Zones' as they relate to this project.
6. Sheet A2.2.1d; Second Level: A detail 2/A9.9.5A has been added at a Glazed Wall and Deluge Sprinkler System area. Sheet A9.9.5A was not in this submittal set. Please clarify.
7. Sheet A2.2.2d; Second Level: A detail 1/A9.9.6A has been added at the Cafe Service Area. Sheet A9.9.6A was not in this submittal set. Please clarify.
8. Sheet A2.2.4d; Second Level: A detail 9/A9.3.5 has been added at Corridor 0250510. Sheet A9.3.5 was not in this submittal set. Please clarify.
9. Sheet A3.2.1; Second Level: A detail 2/A9.9.5A has been added at a Glazed Wall and Deluge Sprinkler System area. Sheet A9.9.5A was not in this submittal set. Please clarify.
10. Sheet A7.1.3; Enlarged Plan: A detail 7/A9.9.1 has been added at the ADA Toilet/Shower area 0140715. Sheet A9.9.1 was not in this submittal set. Please clarify.
11. Sheet A7.1.4; Enlarged Elevations: The wall protection note on Elevations 1, 2, 3, and 4 references 9/A9.6.1. Sheet A9.6.1 was not in this submittal set. Please clarify.
12. Sheet A8.2.1; Interior Elevations: Elevation 7 did not appear to provide the vertical dimension to locate the new thermostat. Please verify.
13. Sheet A8.2.4; Interior Elevations: Elevations 13 and 16 did not appear to provide the vertical dimension to locate the new thermostat. Please verify.
14. Sheet A8.2.6; Interior Elevations: Elevation 19 did not appear to provide the vertical dimension to locate the new thermostat. Please verify.
15. Sheet A8.2.25; Interior Elevations: The wall protection note on Elevation 5 references 1/A9.6.1. Sheet A9.6.1 was not in this submittal. Please clarify.
16. Sheet A9.3.1.2; Door Schedule: There is no indication on the schedule that the hardware for door 0250315 has been revised. Please verify.
17. Sheet S2.12.15 (Enlarged Plan); Sheet S2.12.26 (Detail 2B): The Detail 2B/S2.12.26 indicates an 'HSS Per Plan'. No size for that tube was located on the enlarged plan. Please verify.
18. Sheet S2.12.25; Enlarged Plan 1: The lower support structure has a section cut 5/S2.12.7. Please revise the sheet reference on that section cut.
19. General: For all new sheets containing plans, please provide a more specific key plan (in the title block) that denotes more exactly the area shown on that sheet. It is difficult to locate specific room locations on the plan when the key plan only indicates a large, general area.
20. General: Please provide written responses to all review comments.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/19/2018 TWEIDEM1 APPROVAL SHELF Completed
01/19/2018 TWEIDEM1 OUT TO CUSTOMER Completed
01/19/2018 TWEIDEM1 REJECT SHELF Completed