Review Date Reviewer's Name Type of Review Description Status Comments
11/17/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A1: The distance from the South wall of the building to the public way is denoted as 10'1" but the property Line (PL) is located approximately 9'2" from the building which would require the wall to have a 1 hour fire-resistance rating. Verify and coordinate/revise.
2. Sheet A1&A2 Door Schedule/Hardware: Door 1 has a hardware package include a deadbolt. Doors serving rooms or spaces in Group E with an occupant load of 50 or more shall not be provided with a latch or lock unless it is panic hardware. Please revise. Reference IBC 1008.1.10
3. Sheet A1 Code Analysis: Floor area calculations for sprinkler requirements denotes the floor area of 4,634 as being greater than 12,000. Please revise.
4. Sheet A1 Code Analysis; Egress Requirements: Please revise minimum width from 66" to 26.6" (133 X .2"=26.6").
5. Sheet A1 Keynote 13: The Architect or Structural Engineer shall evaluate the existing ceiling header and determine if it can be removed and to what extent. Once evaluated, please denote on the drawings the requirement(s) and or extent of the removal.
6. Sheet A1 Concealed Spaces: Include on the drawings the location and method used for all required draft stopping of concealed spaces. Reference IBC Section 718
7. Sheet A1 Attic Ventilation: With regards to the above comment, re-calculate and revise drawings as necessary to illustrate proper ventilation of separate attic spaces which will be created due to draft stopping.
8. Sheet A2 Keynotes: Please correct the number sequence of the keynotes. (12 is used twice)
9. Sheet A3 Detail 1: Include in the detail the required graspable handrail. Reference IBC 1012
10. Sheet A3 Detail 1: Handrails shall return to a wall, guard or walking surface. Please revise detail. Reference IBC 1012.6
11. Sheet A3 Detail 1: Verify guards comply with IBC 1013 as required by IBC 1010.
12. Sheet A4 Cross Section: Detail 4/A6 (footing) is denoted at an exterior wall opening. Verify and revise.
13. Sheet A6 Detail 3: Simpson H2.5 is a discontinued item. Please revise to reference an available item.
14. Sheet S0 Fastener Schedule: Fastener schedule references the International Residential Code. Verify and revise as necessary to reference and reflect the requirements denoted in the International Building Code Table 2304.9.1.
15. Sheet S0 Concrete: Unable to read Note C Reinforcing Material due to overlapping text. Please revise.
16. Sheet S0 Special Inspections: Please include a Special Inspection Certificate with the next submittal for all required special inspections denoted.
17. Sheet S1: Detail 4/S1 (stair) is denoted at the west foundation. Verify and revise as necessary.
18. Sheet S1: Detail 4/A6 (footing) is denoted at the exterior stairs. Verify and revise as necessary.
19. Structural Calculations & Sheet S0: Structural Calculations denote the Roof Live Load as 16 psf but the drawing denotes the Roof Live Load as 20 psf. Verify and revise/coordinate.
20. Structural Calculations & Sheet S0: Structural Calculations denote the Roof Dead Load as 17 psf but the drawing denotes the Roof Dead Load as 20 psf. Verify and revise/coordinate.
21. General: Provide written responses to all comments.
11/22/2017 TPROBAS1 WATER REVIEW Passed
11/22/2017 TPROBAS1 PLUMBING-COMMERCIAL REVIEW Passed
11/22/2017 TPROBAS1 ELECTRICAL-COMMERCIAL REVIEW Reqs Change 1. Sheet E3: Provide lighting for the mechanical room. Reference NEC 210.70 (C)
2. Sheet E4 Once Line Diagram: Verify and denote on the drawing that the existing feeders connecting to the new panel are correctly sized.
11/22/2017 TPROBAS1 MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Sheet M1 & M2: On Sheet M1 it is noted to set the outside air intakes @ 450 cfm each but on Sheet M2 Equipment Schedule the Intake specified is denoted as having a capacity of 400 cfm each. Verify