Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T17CM08309
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/08/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
11/08/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide plans sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. The civil and architectural backgrounds on drawings P1.0, P1.1 and P2.0 as well as the waste riser diagram on sheet P2.1 are too faint. Reprint the drawings for clarity. Reference: Section 107.2.1, IBC 2012. 3. The column numbers on the plumbing plans are in different locations compared to the architectural drawings. Coordinate with the architect. Reference: Section 107.2.1, IBC 2012. 4. Provide water demand and pipe sizing calculations for the water distribution system. Reference: Sections 604.1 and 604.3, IPC 2012 as amended by the City of Tucson. 5. Provide a full-open valve for the water service at the building entrance. Reference: Section 606.1(2), IPC 2012. 6. Provide a shutoff valve for the drinking fountain. Reference: Section 606.2, IPC 2012. 7. Clarify the purpose of the reduced pressure backflow assembly located inside the building. Is it duplicating the assembly located after the water meter? Reference: Section 107.2.1, IBC 2012. 8. Show that each equipment water connection is protected from backflow. Reference Sections 608.1 and 608.16, IPC 2012. 9. Provide for sterilization and testing of the domestic water system per Section 610, IPC 2012. 10. Verify that all of the vents (except for vents serving interceptors located outdoors) rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2012. 11. The rim elevation of the next upstream sanitary manhole (MH 5831-30, 2524.0') is less than 12" below the first floor elevation of the equipment area and occupied area (2524.19') and is higher than the floor elevation of the wash tunnel (2523.69'). Provide a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson. |
11/08/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide plans sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. The architectural backgrounds on drawings M1.1 and M1.2 are too faint. Reprint the drawings for clarity. Reference: Section 107.2.1, IBC 2012. 3. The column numbers on the mechanical floor plans are in different locations compared to the architectural drawings. Coordinate with the architect. Reference: Section 107.2.1, IBC 2012. 4. The roof framing drawing, S2.2, does not include heat pump HP-1 and its 750-pound point load. Coordinate with the architect. Reference: Section 302.1, IMC 2012. 5. Provide calculations demonstrating adequate ventilation for the occupied spaces using the current code. Reference: Section 403.2, IMC 2012. 6. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). Reference: Section 403.2.1 (4), IMC 2012. 7. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Use the exterior design conditions shown in Section 302.2, IECC 2012, as modified by the City of Tucson. Reference: Sections C302.2, C403.2.1, and C403.2.2, IECC 2012 as amended by the City of Tucson, and Section 312.1, IMC 2012. 8. Provide a thermostatic control for the heat pump that provides for off-hour and set-back control, automatic shutdown and automatic start-up control (i.e. the thermostat is capable of automatically adjusting the start time of the HVAC equipment in order to bring the interior conditions to the desired temperature at the start of occupancy) and, if the thermostat does not require manual changeover from the heating and cooling modes, it restricts set point overlap. Reference: Section C403.2.4, IECC 2012. |
11/08/2017 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2012. |
11/14/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide complete compliance with the 2012 IECC for lighting. #2. Provide complete compliance with the Tucson/Pima County Outdoor Lighting Code. Yhis Code can be downloaded or printed from www.tucsonaz.gov/pdsd. #3. Provide electrical plans sealed by an Arizona registrant. #4. Locate panel 'L1' on the power floor plan. #5. Ref; Plan Sheet E8.0. (a) Provide disconnecting means and overcurrent protection for the 112.5 kva transformer as required per NEC art 240.21C and 450.14. (b) Per the feeder schedule, 4# 2/0 and #6 ground will not fit in a 1-1/4" conduit as shown for feeder marked 3. NEC Table-C1. (c) Provide the AIC ratings of the Panels. Ref: 2012 IBC sec 107.2.1, 2012 NEC. |
11/22/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A5.0 Building Section 4: Details 9,10,11/A6.4 are referenced at floor level. Verify correct reference and revise as necessary. 2. Sheet A5.1 Wall Section 2: Details 10 & 11/A8.3 are referenced at the storefront system. These details are for Roll Up Doors. Verify and revise as necessary. 3. Sheet A5.1 Wall Section 6: Detail 7/A8.3 is referenced at the storefront. This detail is for Hollow Metal Door Head. Verify and revise as necessary. 4. Sheet A6.3 Enlarged Restroom Plan: Distance from wall to lavatory is approximately 4'9". This distance shall be a minimum of 60". Verify and revise as necessary. Reference ANSI A117.1-2009 Section 604.3.1 and Figure 604.3 5. Sheet A6.4: City of Tucson requires all lettering to be a minimum of 3/32" in height. Please enlarge lettering. 6. Structural General: Include a Special Inspection Certificate for all required Special Inspections denoted. 7. Sheet S4.1 Detail 115: Provide structural calculations for Vacuum Canopy caisson. 8. General: Provide written responses for all comments. |
11/30/2017 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T17CM08309 - New Carwash Cleanfreak Alvernon Building Plans (1st Review) 1475 S Alvernon Way TRANSMITTAL DATE: November 30, 2017 DUE DATE: December 07, 2017 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the current version of the (unapproved) development package DP17-0048. While the building footprint is consistent with the current version of the DP as it relates to the zoning review purview (Use, Building footprint, Height, Building square footage, Site conditions etc) zoning cannot approve the building plans until the Commercial Plans reviewers have approved the building plans and the Development Package has been fully approved by PDSD. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the approved DP. 3. COMMENT: If any changes are necessary, due to the PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the corresponding DP will need to be updated prior to approval of the building plans by Zoning. 4. COMMENT: Once the plans have been reviewed and approved by the Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Building Plans |
12/07/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | DP must be approved first |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/12/2017 | QJONES1 | APPROVAL SHELF | Completed |
12/12/2017 | QJONES1 | OUT TO CUSTOMER | Completed |
12/12/2017 | QJONES1 | REJECT SHELF | Completed |