Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM08138
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/31/2017 | MGAYOSS1 | ZONING | REVIEW | Approved | |
| 10/31/2017 | TPROBAS1 | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 10/31/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide a maintenance receptacle for the mechanical equipment as required per NEC art, 210.70C. |
| 10/31/2017 | MGAYOSS1 | ENGINEERING | REVIEW | Passed | |
| 10/31/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Structural Calculations; Sheet C1: Please include a structural drawing (full size) of the existing roof framing and the new RTU's. Sheet C1 indicates to keep all mechanical loads off the 8"x8" beams. Where are these beams located? Indicate on the plan. 2. Structural Calculations; Sheet C2: Where are these 2x8 at 24" o.c. located? Indicate on the plan. 3. Structural Calculations; Sheet C3: Where are these 6"x6" beams located? Indicate on the plan. 4. Structural Calculations; Sheets D1 and D2: Please indicate the detail cuts on the roof framing plan. Provide the details (shown in the calculations) on that sheet. |
| 10/31/2017 | TPROBAS1 | WATER | REVIEW | Completed | |
| 10/31/2017 | TPROBAS1 | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 10/31/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 10/31/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |