Permit Number: T17CM08117
Parcel: 14044018J

Address:
7440 S WILMOT RD

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T17CM08117
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/10/2018 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Principle Planner

PROJECT: Dollar General @7440 S. Wilmot Road
T17CM08117
Building Plan (1st Review)

TRANSMITTAL DATE: January 10, 2018

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. The building plans have been reviewed for compliance with development package DP17-0213. Although the building plans appear to comply with the development package, until the building plans are approved by all other PDSD review agencies zoning cannot approved the building plans.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
01/10/2018 SSHIELD1 ENGINEERING REVIEW Needs Review
12/21/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Previous Comment 13; Special Inspection Certificate: This submittal contained two incomplete Special Inspection Certificates. Before the City of Tucson permit technicians will allow any permit to be issued, Parts A and B on the Certificate must be completed (including the registrant's seal, signature, and date), the specific special inspections (under Category) must be entered, and the ICC certified special inspector (by name) must be listed for each special inspection. Lastly, these inspectors must be approved by the building official and signed and dated.
2. Previous Comment 14; General: It has now been indicated by a note on the Mid-West Steel Building Company structural calculations and drawings that the project engineer of record has found those documents to be in general conformance to the building design. Please sign and date that note.
12/22/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
12/22/2017 ROBERT SHERRY WATER REVIEW Reqs Change Comment not addressed. [Initial comment: Show the locations and sizes of the proposed water meter, backflow preventer, and the water service pipe on a site plan. The development package is not a substitute for a complete site plan. Reference: section 107.2.5, IBC 2012.]
12/22/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Comment not addressed. [Initial comment: Provide a site drawing showing the size, route, and slope of the building sewer, the location of all required cleanouts, and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2012.]
2. Provide the slope of the gutters; the 5" gutters will work only if the slope is at least ΒΌ" per 12". See Table 1106.6, IPC 2012. [Initial comment: Provide the dimensions of the gutters and downspouts. Reference: Sections 1106.1 and 1106.6, IPC 2012.]
3. Relocate the shutoff valve for the water distribution system from the receiving area to the location where it enters into the building. Reference: Section 606.1 (2), IPC 2012.