Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T17CM08117
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/01/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 11/01/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide automatic faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucets will operate for at least 10-seconds for accessibility. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Provide tempered water for the public restroom lavatories using approved devices conforming to ASSE 1070. (Note the manufacturer's recommended temperature range for hot water.) Reference: Sections 416.5 and 607.1.2, IPC 2012. 3. Clarify the notes in detail 1/P2 calling for the T&P relief and the pan drain to discharge to a hub drain; no hub drain is shown. Reference: Section 107.2.1, IBC 2012. 4. Include the lavatory for the women's restroom in detail 6/P2. Reference: Section 107.2.1, IBC 2012. 5. Provide a site drawing showing the size, route, and slope of the building sewer, the location of all required cleanouts, and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2012. 6. Provide the dimensions of the gutters and downspouts. Reference: Sections 1106.1 and 1106.6, IPC 2012. |
| 11/01/2017 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Reduced pressure backflow prevention assemblies are required to be installed in locations accessible to Tucson Water. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf. 2. Show the locations and sizes of the proposed water meter, backflow preventer, and the water service pipe on a site plan. The development package is not a substitute for a complete site plan. Reference: section 107.2.5, IBC 2012. 3. Verify the expected water pressure with Tucson Water. Data from Tucson Water indicates that the water pressure range will be 49 to 56 PSI, not 65 PSI. |
| 11/02/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C302.2, C403.2.1, and C403.2.2, IECC 2012 as amended by the City of Tucson, and Section 312.1, IMC 2012. 2. Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or below grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2012, as amended by the City of Tucson. 3. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). Reference: Section 403.2.1 (4), IMC 2012. |
| 11/09/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 11/14/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet T02; Governing Codes: Please replace the 2010 ADA Accessibility Code with the 2009 ICC/ANSI A117.1 Accessibility Code. 2. Sheet F01: The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise all dimensions as required. 3. Sheet A01 (Floor Plan); Detail 6/A01: The detail indicates only 3 5/8" metal studs. On the floor plan (and the enlarged plan on Sheet A06), the wall between the restrooms appears to be a larger stud size. Please verify and revise the drawings as required. 4. Sheet A01; Detail 7: How is the top of this partition braced? Please indicate with notes/details on the drawings as required. 5. Sheet A01 (Keyed Note 24); Sheet S-1 (Foundation Plan): Note 24 indicates slab control joints that do not match the control/construction joints indicated on the foundation plan. Please coordinate. 6. Sheet A01 (Keyed Notes 10 and 24); Sheet S-1 (Foundation Plan): Please coordinate all notes and drawings for slab joints. 7. Sheet A02 (Keyed Note 22); Sheet A01 (Floor Plan): Note 22 indicates eye bolts epoxied into a block wall. The floor plan does not indicate any block walls. Please clarify. 8. Sheet A03; Section 3 and Detail 6: Wall section 3 indicates a wall girt located where the canopy roof intersects the wall, while detail 6 indicates the girt above the canopy roof. Is the location of that girt critical to the support of the canopy? Please verify and revise as required. 9. Sheet A07; Detail 2: Please provide structural calculations for the light pole foundation. 10. Sheet A08: The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise as required. 11. Sheet S-1; Boxed Note: A note at the plan indicates to see Sheet T-2 for foundation insulation requirements. Please revise that sheet reference. 12. Sheet S-2: The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise the General Structural Notes. 13. General: Please provide a Special Inspection Certificate (available on the City of Tucson website) for all categories of special inspections required, including the name of each special inspector for each category. Reference the IBC Chapter 17 for required special inspections. 14. General: Per the IBC Section 107.3.4, the design professional in responsible charge shall be responsible for review and coordination of submittal documents prepared by others. The submitted calculations and drawings by the Mid-West Steel Building Co. must be reviewed by the registered structural design professional in responsible charge, and that individual shall provide a notation on those documents that the submittal documents have been reviewed and found to be in general conformance to the design of the building. At that time, those documents shall be submitted to the City of Tucson. 15. General: Please provide written responses to all review comments. |
| 11/27/2017 | KROBLES1 | ZONING | REVIEW | Needs Review | |
| 11/27/2017 | KROBLES1 | ENGINEERING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/27/2017 | KROBLES1 | OUT TO CUSTOMER | Completed |