Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Active
Review Details: COMMERCIAL - TI
Permit Number - T17CM07991
Review Name: COMMERCIAL - TI
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/25/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
10/25/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/26/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that the cut-off time for the automatic faucets specified for the lavatories will be set to dispense a maximum of 0.25 gallons per metering cycle and will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Clarify the location of the terminations for the T&P relief and for the water heater pan drain shown in detail 3/MTPH1. Reference: Sections 504.6 and 504.7.2, IPC 2012. 3. Explain why a water heater located under a counter does not require a pan. Reference: Section 504.7, IPC 2012. 4. At a minimum, beverage dispensers require the use of a backflow preventer listed to ASSE 1022. Reference: Section 608.16.10, IPC 2012. 5. Connect the effluent of the sump pump P-5 to the sanitary drain system as described in Section 712.3.5, IPC 2012. 6. Provide separate indirect waste pipes for each compartment of any new 3-compartment sinks to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012. 7. Verify that the hub drain shown in detail 3/P1 is located in a ventilated space and has ready access. Reference: Sections 202 and 802.3, IPC 2012. 8. Reconcile the note in detail 4/P3 requiring a maximum distance of 15-feet for the combination waste and vent branch line to a 4" sanitary main with the pipe sizes shown on plumbing plan 1/P2. Reference: Section 107.2.1, IBC 2012. 9. Verify that all of the vents (except for vents serving interceptors located outdoors) rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally, i.e. no vents below grade. Reference: Section 905.4, IPC 2012. 10. Revise the size of the vents for the combination drain and vent systems; vents exceeding 40-feet in developed length are required to be increased by one pipe size for their entire length. Reference: sections 906.2 and 915.2.3, IPC 2012. |
10/27/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project (summary sheets will be adequate). Reference: Sections C302.2, C403.2.1, and C403.2.2, IECC 2012 as amended by the City of Tucson, and Section 312.1, IMC 2012. 2. Verify that the condensate drains for the new rooftop units will terminate in accordance with Section 307.2.1, IMC 2012, as amended by the City of Tucson (i.e. not onto the roof surface or into a plumbing vent). 3. Provide calculations demonstrating adequate ventilation using the current code. Reference: Section 403.2, IMC 2012. |
11/13/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet C1; Project Data and Code Information (Codes): Please revise the accessibility code to the 2009 ICC/ANSI A117.1. 2. Sheet N1: Please revise the accessibility code reference for the tactile exit sign information, the restroom symbols information, and the signage legend information. In addition, revise the information to meet the requirements of the ICC/ANSI. 3. Sheets SQ1, D1, A1.1, A1.2, and A4: Please provide a north arrow on the plans. 4. Sheet A4; Roof Plan: Move the verbiage on the club pickup canopy to align with the arrow. 5. Sheet A5; Office Mezzanine Plan: Per the IBC Section 1108.2.9.1, 5% of the dining surfaces shall be accessible. On this plan, please indicate the total number of seats, and the required number of accessible seats/tables. Please indicate on the plan the location of the accessible seats/tables, and include a note indicating the table surface height at those locations. 6. Sheet A5.1; Grab Bars: Please indicate on this sheet the location and length of the restroom grab bars per the ICC/ANSI Figures 604.5.1 and 604.5.2. 7. Sheet A6; Partition Legend: Please indicate the stud spacing for all partition types, or reference the specifications. 8. Sheet A6; Partition Bracing Detail: Please indicate the size and number of connectors for the partition brace to the top of the partition. In addition, extend this detail to show how the brace attaches to the structure above. 9. Sheet TPH1; Temporary Pharmacy Plan: Is this plan indicated on the floor plan on Sheet A1? Please provide. 10. Sheet SB1; Snack Bar Plan: Please verify the service counter meets the requirements of the ICC/ANSI for approach (904.3.1 and 904.3.2) and height (904.3.1). 11. Sheet SB1; Snack Bar Plan: Per the IBC Section 1108.2.9.1, 5% of the dining surfaces shall be accessible. On this plan, please indicate the total number of seats, and the required number of accessible seats/tables. Please indicate on the plan the location of the accessible seats/tables, and include a note indicating the table surface height at those locations. 12. Sheet SB1; Snack Bar Plan: Please verify the drink dispensers meet the requirements of the ICC/ANSI for approach (904.3.1 and 904.3.2) and height (904.3.1). 13. General: Please provide a site plan per the requirements of the IBC Section 107.2.5. The plan used for the develop permit may be used. 14. General: Please provide notes/details on the drawings indicating cash register stations, checkout stands, and order counters meet the requirements of the ICC/ANSI for sales and service approach (904.2 and 904.3), check-out counter heights (904.4), work surfaces height (902.4), and work surfaces clear floor space (902.2). 15. Sheet S0; General Notes (Foundations): Note 2.1 indicates a soil report was used to design the footings. Please provide one copy of that soil report for review. 16. Sheet S0; Statement of Special Inspections: The second sentence indicates to refer to the applicable project specifications for the information regarding special inspection requirements. Are there specifications for this project that were included in this submittal? If not, remove that note and reference Sheet S6 for the canopy special inspections. 17. Sheet S0; Statement of Special Inspections: Please indicate the required special inspections for this project, and provide a Special Inspection Certificate indicating the individuals to perform specific special inspections. This form is located on the City of Tucson website. 18. Sheet S1 (Overall Foundation Plan); Sheet S4 (Detail 10): Near Grid 6 and north of Grid H (on the Overall Foundation Plan), a note references 10/S4 for slab trenching. That detail references architectural for the trench size. The size and location of that trench was not located on the architectural drawings. Please provide. 19. Sheet S1; Overall Foundation Plan: Please provide all trench sizes and locations on this sheet. 20. Sheet S1; Overall Foundation Plan and Enlarged Foundation Plan: Please provide a north arrow on the plans. 21. Sheet S1 (Enlarged Foundation Plan); Sheet S2 (Enlarged Framing Plan): Structural calculations were not found for the new tire and battery center. Please provide. 22. Sheet S2; Overall Framing Plan and Enlarged Framing Plan: Please provide a north arrow on the plans. 23. Sheet S2; Overall Framing Plan: How do the new RTU weights compare to the existing RTU weights? Please indicate on this sheet, and verify if a structural engineer has reviewed the existing structure for those new weights. RTU information is indicated on Sheet M4, and operating weights of the new units are included, but no operating weights of the existing units were found. 24. Sheet S6; New Canopy: Since the canopy framing will be a deferred submittal, please provide the verbiage of the IBC Section 107.3.4.1 on the drawings, including listing on the drawings, submittal requirements, review requirements, and approval requirements. 25. Sheet S6; Canopy Foundation Detail: A boxed note indicates the canopy foundation is preliminary. After review of the framing deferred submittal, please finalize the foundation calculations and drawings, and submit to the City of Tucson for review. 26. General: Please provide written responses to all review comments. |
11/16/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide complete compliance with the Tucson/Pima County Outdoor Lighting Code for all exterior luminaires. Canopy, loading dock, replaced wall packs. #2. Provide overcurrent protection for transformer secondary feeders and the new panel 'LRX'. NEC art 240.21, 408.36b. Ref; 2012 IBC sec 107.2.1, 2011 NEC |
11/16/2017 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T17CM07991 - Sam's Club Interior Renovation and Canopy Additions Commercial Building Plans (1st Review) 4701 N Stone Avenue TRANSMITTAL DATE: November 16, 2017 DUE DATE: November 22, 2017 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. COMMENT 1: Zoning has reviewed the building plans for compliance with the approved development package. While the building footprint and the site revisions are consistent with the approved DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc) zoning cannot approve the building plans until the Commercial Plans reviewers have approved the building plans. COMMENT 2: Zoning will review the building plans on the next submittal to assure that any revisions made to the building plans do not affect zoning requirements. COMMENT 3: Once the plans have been reviewed and approved by the Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/24/2017 | ANY | REJECT SHELF | RECEIVED |