Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM07988
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/24/2017 | MMORENO1 | ZONING | REVIEW | Approved | |
10/24/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the nature of the area of work. The architect has labeled it as a "warm shell" and as an exercise room. 2. If the room is to be an exercise room, revise the ventilation calculations. 3. Provide cooling/heating load calculations for the new water source heat pumps |
10/24/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
10/24/2017 | MMORENO1 | ENGINEERING | REVIEW | Passed | |
10/24/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet g2.0; Code Analysis: The cover sheet indicates this is a 'warm shell'. Sheet g2.0 indicates an occupancy classification and an occupant load. Remove these from Sheet g2.0. This information will be required for the tenant improvement permit. 2. Sheet a1.0; Wall Types: Please indicate how the top and bottom of the new partitions are connected to the floor and the structure above. 3. Sheet s2.0; Framing Plan: Please provide structural calculations for the new mechanical supports (see details 1 and 2 on Sheet s1.0). 4. General: Provide a special inspection certificate for field welding and expansion anchors. 5. General: Please provide written responses to all review comments. |
10/24/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
10/24/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
10/24/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/24/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |