Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM07844
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/18/2017 | MGAYOSS1 | ZONING | REVIEW | Approved | |
| 10/18/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The shell building being modified in this activity was not conditioned. Section C101.4.5, IECC 2012 requires the space to be brought into full compliance with the current energy code. Provide energy code compliance calculations for this suite of the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of this suite of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012. 2. Show how one of the "Additional Efficiency Package Options" (C406, IECC 2012) is to be accomplished. Reference: Section C401.2, IECC 2012. 3. Review the submitted heating/cooling load calculations and compare them to the proposed capacities of the rooftop units being installed. The capacities of the units are not to be greater than the calculated loads. Reference: Section C403.2.2, IECC 2012. |
| 10/18/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 10/18/2017 | MGAYOSS1 | ENGINEERING | REVIEW | Passed | |
| 10/18/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 10/18/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 10/18/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 10/18/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 10/19/2017 | JVINCEN1 | FIRE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/25/2017 | QJONES1 | APPROVAL SHELF | Completed |
| 10/25/2017 | QJONES1 | OUT TO CUSTOMER | Completed |
| 10/25/2017 | QJONES1 | REJECT SHELF | Completed |