Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM07720
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/12/2017 | ALEXANDRA HINES | ZONING | REVIEW | Approved | |
| 10/12/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The cooling load calculations indicate a heat pump with less cooling capacity is needed. Verify the load calculations and the size of the specified heat pump. 2. Provide an economizer for the heat pump. |
| 10/12/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 10/12/2017 | AHINES2 | ENGINEERING | REVIEW | Passed | |
| 10/12/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A0.0; Code Analysis Data: The occupancy indicates 528 + 96 = 622 total occupancy. This total should be 624, which agrees with the occupant break down on Sheet A0.1. Please revise the 622 total. 2. Sheet A2.0; Proposed Floor Plan 3: Floor plan keynote 1 indicates a new 3 5/8" metal stud partition. Please provide the metal stud gauge in the note. 3. Sheet A3.0; Detail 4: Please indicate the brace stud gauge, and indicate the size and quantity of connectors at the existing roof and at the top of the new partition. 4. General: Please provide written responses to all review comments. |
| 10/12/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 10/12/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 10/12/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 10/12/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |