Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T17CM07595
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/24/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. As per the last electrical review comment #2," The total number of conduits and conductors for all the paralleled feeders do not correlate. Please clarify. See descriptions of feeders on Plan Sheet E6.1". (a) Include the grounds and neutrals in the total number of conductors for all the feeders including the feeders shown down-stream of the new distribution section 'DSA'. (b) The feeders between the 4000 amp transfer switch and the new generator show 5 sets of conductors, 4" conduit, and then shows 4 conduits in the same run. Please clarify. (c) The note to isolate the grounds and neutrals in the existing equipment 'MS1' and 'MS2' as requested per the last electrical plan review comment #3 was not addressed on the plan sheet E6.1, as stated per the response. Equipment grounds are not shown with the feeders from the new 48" x 48" x 48" manhole #1 to the existing SES 'MS1' and MS2' as required per NEC art 250.32b. Ref 2012 IBC sec 107.2.1, 2011 NEC. |
| 10/24/2017 | ALEXANDRA HINES | ZONING | REVIEW | Reqs Change | Provide copy of last approved site plan that shows the generator. Demonstrate that parking requirements are met. It appears that the parking is being removed. |
| 10/27/2017 | QJONES1 | ENGINEERING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/27/2017 | QJONES1 | APPROVAL SHELF | Completed |
| 10/27/2017 | QJONES1 | OUT TO CUSTOMER | Completed |
| 10/27/2017 | QJONES1 | REJECT SHELF | Completed |