Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T17CM07499
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/30/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 01/30/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 02/19/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet S1.0 (Foundation Plan): Structural Calculations (Roof Framing Key Plan): The calculations indicate to use a footing F3 at the west end of B1A. Should this be the west end of B1? Should the F-2 footing at that location be an F-3 per the calculations? Please verify. 2. Sheet S1.0 (Foundation Plan); Structural Calculations (Roof Framing Key Plan): Please provide the calculations for the column at the east end of B1A and the west end of B1. 3. Sheets S1.0 and S2.0; Plans: Are the intermediate beam sizes, support column sizes, and footing sizes the only changes to these two plans? Please verify. 4. Sheet S1.0; Foundation Plan: Did the shear wall sizes or hold downs change from the original design? Please verify. 5. Sheet S2.0; Roof Framing Plan: In the upper roof framing plan (west), a beam B3 is indicated (where Section 6/A4.2 is cut). Looking at that section, where does that B3 occur? Please verify. 6. General: Please provide two sets of calculations signed, sealed, and dated by the engineer of record. 7. General: Please provide written responses to all review comments. Reviewed by Eric Newcomb Contact at 520-837-4911 or Eric.Newcomb@tucsonaz.gov |
| 02/26/2019 | QJONES1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/26/2019 | QJONES1 | APPROVAL SHELF | Completed |
| 02/26/2019 | QJONES1 | OUT TO CUSTOMER | Completed |
| 02/26/2019 | QJONES1 | REJECT SHELF | Completed |