Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T17CM07415
Parcel: 12801005H

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T17CM07415
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/23/2017 STEVE SHIELDS ZONING REVIEW Approved
10/23/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Comment not addressed. [Initial comment: Provide information regarding the custom powder hood (e.g. recirculating or exhaust). Reference: Section 107.2.1, IBC 2012.]
10/23/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Previous Comment 4; Sheet A1.1; Floor Plan: Note 22.01 has been changed to Note 11.06, but that note has not been added to the Keyed Notes list. Please add.
2. Previous Comment 5; Sheet A2.1; Elevation A2: The hot water heater is indicated on a raised platform. The structural calculations have been provided for the platform, but the framing needs to be shown on the full size drawings. Please add.
3. General: Please provide written responses to all review comments.
10/23/2017 SSHIELD1 ENGINEERING REVIEW Passed
10/25/2017 KROBLES1 PLUMBING-COMMERCIAL REVIEW Needs Review 1. Calculations have been provided for support of the water heater but no design has been shown on the drawings. [Initial comment: Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported from the building structure. Reference: Section 301.2, IPC 2012.]
2. Verify that the manufacturer's listing allows the installation of an expansion tank on the hot water supply piping. [Initial comment: Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503, 504, 606.1, and 607.3, IPC 2012.]
3. No cleanout has been shown for the section of the building drain located immediately downstream of the hydromechanical grease interceptor. [Initial comment: Provide a cleanout for the section of the building drain located immediately downstream of the hydromechanical grease interceptor. Reference: Section 708.3.1 and 708.3.3, IPC 2012.]
4. The specified hydromechanical grease interceptor (Schier GB-25) has a built-in flow control device. The additional flow control fitting and vent shown in the grease interceptor piping detail is not needed.