Permit Number: T17CM06841
Parcel: 11619227A

Address:
255 N GRANADA AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T17CM06841
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/08/2017 ROBERT SHERRY WATER REVIEW Reqs Change Show the location and size of both the water service meter and the reduced pressure backflow preventer assembly. Provide the serial number of the existing water meter. Reference: Section 107.2.1, IBC 2012.
09/08/2017 JVINCEN1 FIRE REVIEW Approved
09/11/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide construction documents that are complete and clearly indicate the extent of the proposed work (i.e. remove the "Progress Submission, not for Construction" label from the drawings.). Reference: Section 107.2.1, IBC 2012.
2. Provide the minimum plumbing facilities required by Table 2902.1 and Section 2902.2, IBC 2012, for assembly occupancy (e.g. a drinking fountain).
3. Provide water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2012.
4. Provide automatic faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucets will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
5. Provide tempered water for the public restroom lavatories using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012.
6. Provide a complete diagram of the natural gas distribution system showing the all of the loads, developed lengths, and the layout of the distribution piping. Reference: Section 107.2.1, IBC 2012.
09/11/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide construction documents that are complete and clearly indicate the extent of the proposed work (i.e. remove the "Progress Submission, not for Construction" label from the drawing M101.). Reference: Section 107.2.1, IBC 2012.
2. Demonstrate energy code compliance for the additions and alterations to the building envelope based on the current code. Reference: Sections C101.4.3, C101.5, C103.2, C303, and C401.2.1, International Energy Conservation Code 2012.
3. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C302.2, C403.2.1, and C403.2.2, IECC 2012 as amended by the City of Tucson, and Section 312.1, IMC 2012.
4. Verify the minimum seasonal energy efficiency rating (SEER) for the combined split-system air conditioning unit in the equipment schedule. (Note that the air handler for the proposed split-system is not capable of moving 2,000 CFM.) Reference: Section C403.2.3, IECC 2012.
5. Show that each rooftop unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and automatic start-up control (i.e. the thermostat is capable of automatically adjusting the start time of the HVAC equipment in order to bring the interior conditions to the desired temperature at the start of occupancy) and, if the thermostat does not require manual changeover from the heating and cooling modes, it restricts set point overlap. Reference: Section C403.2.4, IECC 2012.
6. Show that the termination of the vent for the gas-fired, direct-vent, furnace complies with the requirements of Sections 503.2.3 and 503.8 (3), IFGC 2012.
7. Clarify the size of the proposed outside air duct; it is shown as 12" x 12" on the plans but keynote 11 calls it a 12" round duct. Reference: Section 107.2.2, IBC 2012.
8. Calculation of the required minimum ventilation for air handlers serving multiple zones requires the calculations described in Sections 403.3.2.3.1 through 403.3.2.3.4, IMC 2012. Reference: Section 403.3.2.3, IMC 2012.
9. The room identified by the architect as a "Club room" is called out as a "Club room/ Work out area" on the mechanical plan. Clarify the proposed use of the room and adjust the ventilation calculations if required. Reference: Section 403.3, IMC 2012.
09/20/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet 1; Floor Plan: Please provide a north arrow on the plan.
2. Sheet 2; Demolition Plan: Please provide a north arrow on the plan.
3. Sheet 3; Foundation Plan: A new foundation 1 is indicated in the 'New Foundation Description'. This footing was not located on the plan. Please verify.
4. Sheet 3; Foundation Plan: Please provide a north arrow on the plan.
5. Sheet 3; Foundation Plan: Please darken the new masonry wall at the mechanical yard. It is not clear which wall material is used.
6. Sheet 3; Foundation Plan: Please darken all new walls on the plan.
7. Sheets 3 and 4.1; Wall Material Table: The first two descriptions indicate wall 'contraction'. Please revise to construction.
8. Sheet 3; Shear Wall Design: In this table, please reference Sheet 4.1 for the shear wall locations.
9. Sheets 3 and 4.1; Shear Wall Design: For holdown 3, please indicate a capacity of 5090# (per calculation on Sheet 31).
10. Sheet 3; Foundation Plan: The new SW1 at the north wall of the women's restroom (see Sheet 4.1 for designation and calculation Sheet 26) has no footing. Please verify this existing wall requires no new footing.
11. Sheets 4 and 4.1; Floor Plan: Please provide a north arrow on the plans.
12. Sheet 4; Floor Plan: Are all public entrances to the building accessible? Please verify.
13. Sheet 7; Detail 10: The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise.
14. Structural Calculations; Sheet 2: Under the Seismic Design, a note indicates one and two story family dwellings in Seismic Design Categories A, B, and C are exempt from seismic design. This is a commercial structure, and seismic analysis must be provided.
15. General: Are exit signs located on any architectural or electrical sheets to meet the IBC Section 1011? Please verify.
16. General: It appears directional signage might be required at the double door in the north wall of the new workout area to direct occupants to the exit doors on the south wall of that area, and at the north wall of the club room/work out area to direct occupants to the exit doors in the west wall of the reception area. Please verify.
17. General: Please provide general structural notes for this project on a full size sheet.
18. General: Please provide written responses to all review comments.
09/26/2017 SSHIELD1 ENGINEERING REVIEW Passed
10/02/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
10/02/2017 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Principle Planner

PROJECT: 255 N. Granada Ave.
T17CM06841
Building Plan (1st Review)

TRANSMITTAL DATE: October 2, 2017

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Until all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

Final Status

Task End Date Reviewer's Name Type of Review Description
10/10/2017 QJONES1 APPROVAL SHELF Completed
10/10/2017 QJONES1 OUT TO CUSTOMER Completed
10/10/2017 QJONES1 REJECT SHELF Completed