Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM06801
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/06/2017 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
09/06/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide calculations to show how ventilation will be provided for the occupied spaces. Reference: Section 401.2, IMC 2012. |
09/06/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
09/06/2017 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
09/06/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet T1; Development Data: The scope of work indicates this is a retail store, but the occupancy is listed as business (B). Please coordinate. 2. Sheet T1; Occupant Load: The occupant load indicated (11) is based on 100 SF/occupant. Since this is a retail use, revise the occupant load using the IBC Table 1004.1.2 with mercantile use. 3. Sheet T1; Applicable Codes: Please include the 2009 ICC/ANSI A117.1 accessibility code to the list. 4. Sheet A1; Alteration Floor Plan: The IBC Section 1014.2(4) does not allow egress to the restroom through the storage room unless requirements under Exception 2 (including 2.1, 2.2, 2.3, and 2.4) are met. Please verify. 5. General: Please provide written responses to all review comments. |
09/06/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
09/06/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide tempered water for the public restroom lavatory using an approved device conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. 2. Provide cleanouts sized for the nominal size of pipes that they serve up to 4-inches. Reference: Section 708.7, IPC 2012. |
09/06/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
09/06/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/13/2017 | QJONES1 | APPROVAL SHELF | Completed |
09/13/2017 | QJONES1 | OUT TO CUSTOMER | Completed |
09/13/2017 | QJONES1 | REJECT SHELF | Completed |