Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM06587
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/29/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
08/29/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
08/29/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/29/2017 | ACONNOR1 | ENGINEERING | REVIEW | Passed | |
08/29/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A0.0; Project Information: The square footage listed in the "Shell Building Information" (1783 SF) does not match the square footage listed in the "Occupancy/Exiting Loads". Please clarify. 2. Sheet A1.0; Floor Plan: Per the IBC Section 1014.2(4), egress shall not pass through kitchens. In order to get to the accessible restroom, a person must go through a kitchen, or go around the building to the back door. This would require signage. Please verify. Would the existing back door allow entry from the outside? 3. Sheet A1.0 (Floor Plan); Sheet A1.1 (Door Schedule): The door designations on the plan do not match the Door Schedule marks. Please clarify. 4. Sheet A1.0 (Floor Plan); Sheet A1.1 (Partition Types): The plan does not indicate the partition type as detailed on Sheet A1.1. Please clarify. In addition, the Partition Legend on Sheet A1.0 does not match the partitions indicated on the floor plan. 5. Sheet A1.1; Wall Partition Types: Please add a reference to Details 5 and 9 on Sheet A7.0 for the partition types shown. 6. General: Please provide written responses to all review comments. |
08/29/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
08/29/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported from the building structure. Reference: Section 301.2, IPC 2012. 2. Clarify the size of the fixture drain and horizontal branch of the building drain connecting the clotheswasher and the hand sink to the main building drain (shown as 2" on sheet P2.0 and 3" on sheet P4.0). Provide a cleanout for the horizontal branch. Reference: Section 107.2.1, IBC 2012 and Sections 406.2 and 708.3.1, IPC 2012. 3. Show how the fixture drain for the hand sink for the frosting area is connected to the sanitary waste system. Reference: Section 107.2.1, IBC 2012. 4. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. the clotheswasher). The pressure-absorbing devices shall conform to ASSE 1010; an air chamber is not acceptable. Reference: Section 604.9, IPC 2012. 5. Clarify the reason for using an indirect waste for the pot-fill sink. Reference: Sections 301.3 and 802.1, IPC 2012. 6. Hand sinks in the kitchen are allowed to connect to the sanitary waste system instead of the grease waste system only if each sink has a sign posted above it stating, "HANDWASH SINK ONLY! NO FOOD PREPARATION OR DISHWASHING ALLOWED." Reference: Section 1003.3, IPC 2012, as amended by the City of Tucson. 7. Provide calculations to verify the size of the gas piping. Reference: Section 107.2.1, IBC 2012. |
08/29/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
08/29/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
09/26/2017 | ARUIZ1 | WWM | REVIEW | Passed |