Permit Number: T17CM06296
Parcel: 14042072B

Address:
7060 S TUCSON BL

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T17CM06296
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/17/2017 MARTIN BROWN FIRE REVIEW Approved
09/07/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheets PV0.0 through PV1.3: Per the IBC Section 107.1, construction documents shall be prepared by a registered design professional. These drawings have not been sealed. Please verify.
2. Drawing v18110.01 (Sheet 1); Schletter Submittal: The foundation notes indicate a geotechnical report was used for this project. Please provide one copy of that report for review.
3. Drawing v18110.01 (Sheets 1 through 3); Schletter Submittal: Please add a note on these sheets that references the ground mount arrays (G1 through G7) as indicated on Sheets PV0.0 and PV1.0.
4. Drawing v18110.01 (Sheet 2); Structural Calculations (Page 8): The estimated anchoring depth of the post is listed as 81.1" in the calculations, while the drawing (Section A-A) indicates 63 3/4". Please clarify.
5. Drawing v18110.01 (Sheet 3); Structural Calculations (Page 5): The purlin section indicated in the calculations does not dimensionally match the purlin section on Sheet 3. Please verify.
6. Drawing v18110.01 (Sheet 3); Structural Calculations (Page 7): Is the member shown in the calculations (crossbar) indicated on the drawings? Please verify.
7. Drawing v18110.02 (Sheet 1); Schletter Submittal: The foundation notes indicate a geotechnical report was used for this project. Please provide one copy of that report for review.
8. Drawing v18110.02 (Sheets 1 through 3); Schletter Submittal: Please add a note on these sheets that references the ground mount arrays (G1 through G7) as indicated on Sheets PV0.0 and PV1.0.
9. Drawing v18110.02 (Sheet 2); Structural Calculations (Page 8): The estimated anchoring depth of the post is listed as 81.1" in the calculations, while the drawing (Section A-A) indicates 63 3/4". Please clarify.
10. Drawing v18110.02 (Sheet 3); Structural Calculations (Page 5): The purlin section indicated in the calculations does not dimensionally match the purlin section on Sheet 3. Please verify.
11. Drawing v18110.02 (Sheet 3); Structural Calculations (Page 7): Is the member shown in the calculations (crossbar) indicated on the drawings? Please verify.
12. Drawing v18110.03 (Sheet 1); Schletter Submittal: The foundation notes indicate a geotechnical report was used for this project. Please provide one copy of that report for review.
13. Drawing v18110.03 (Sheets 1 through 3); Schletter Submittal: Please add a note on these sheets that references the ground mount arrays (G1 through G7) as indicated on Sheets PV0.0 and PV1.0.
14. Drawing v18110.03 (Sheet 2); Structural Calculations (Page 8): The estimated anchoring depth of the post is listed as 81.1" in the calculations, while the drawing (Section A-A) indicates 63 3/4". Please clarify.
15. Drawing v18110.03 (Sheet 3); Structural Calculations (Page 5): The purlin section indicated in the calculations does not dimensionally match the purlin section on Sheet 3. Please verify.
16. Drawing v18110.03 (Sheet 3); Structural Calculations (Page 7): Is the member shown in the calculations (crossbar) indicated on the drawings? Please verify.
17. Sheet S2.0; Panels P1, P2, and P4: A section through the panels references Sheet S2.2. It appears Sheet S2.2 is incorrectly identified as S2.0. Please verify.
18. Sheet S2.0; Plan Keynotes: Note 1 references Detail 205A for the bridging. Detail 205 (on Sheet S4.0) does not indicate a Detail 205A. Please verify.
19. Sheet S2.0; Footing (F) Schedule: The F2 footing should have 8-#6 longitudinal bars per the structural calculations. Please verify.
20. Sheet S2.1; Panel P3: A section through the panel references Sheet S2.2. It appears Sheet S2.2 is incorrectly identified as S2.0. Please verify.
21. Sheet S2.1: Should the drilled pier (30" option) schedule and the footing (F) schedule be included on this sheet? Please verify.
22. General: Please provide written responses to all review comments.
09/14/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Provide for a field evaluation after the supply side taps are performed for the PV interconnection to the service equipment, to maintain equipment listings. NEC art, 230.66.
#2. Provide for the installation of grounding electrodes at the transformers. As required per NEC art, 250.30A4.
Ref: 2012 IBC sec, 107.2.1, 2011 NEC.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/20/2017 ARUIZ1 OUT TO CUSTOMER Completed