Permit Number: T17CM06272
Parcel: 13419042D

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T17CM06272
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/15/2017 ANDREW CONNOR ZONING REVIEW Approved
08/15/2017 ACONNOR1 ENGINEERING REVIEW Passed
08/16/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
08/16/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
08/16/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet G1: Please revise the spelling of Tucson on this sheet (several locations).
2. Sheet A1 (Floor Plan); Sheet G2 (Door Schedule): Door 109 in the southeast corner of the plan is not listed in the door schedule. Please revise.
3. Sheet A1; Keyed Notes: Note 1 indicates a door chime is 13'-0" aff. Please verify the chime location.
4. Sheet A1; Floor Plan: No drinking fountain was located on the plan. Detail 13/A4.3 provides a detail of a high/low drinking fountain. Please indicate a location on the plan.
5. Sheet A2; Fixture Plan: The City of Tucson requires fixture information on the drawings as follows: a) If the fixture is six feet or less in height, locate and identify the fixture on a plan; b) If the fixture is greater than six feet and equal to or less than twelve feet in height, locate and identify the fixture on a plan, and provide a detail on the drawings for the fixture connection to the floor; c) If the fixture is greater than twelve feet in height, locate and identify the fixture on a plan, provide stamped structural calculations for the fixture, and provide a detail on the drawings for the fixture bracing and connection to the floor. Please verify.
6. Sheet A4.4; Toilet Room Plan: In the men's restroom, the elevation indicators 5 and 6 are reversed. Please verify.
7. Sheet A4.4; Fitting Room Plan: Please locate this plan on the floor plan on Sheet A1.
8. General: Please provide written responses to all review comments.
08/16/2017 MARTIN BROWN FIRE REVIEW Approved
08/16/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
08/16/2017 ROBERT SHERRY WATER REVIEW Completed
08/16/2017 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/21/2017 KROBLES1 WWM REVIEW Passed