Review Details: COMMERCIAL - TI
Permit Number - T17CM06175
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/21/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet TS1; Deferred Submittals: Please revise the deferred submittal reference to the IBC Section 107.3.4.1. 2. Sheet TS1; Code Study (Exit Widths): The required exit width should indicate 50 x .2 = 10.0" per the IBC Section 1005.3.2. Please revise. 3. Sheet TS1; Special Inspections: Please revise the reference to sheet S1.2. In addition, add a special inspection to the Special Inspection Certificate for site preparation per Sheet S1.2. 4. Sheet ASP1; Site Plan: Please indicate on the plan the distances from the addition to the property lines. 5. Sheet S1.0; Structural Notes (Foundations): Note 1 indicates a soils report was used in the foundation design. Please provide one copy of that report for review. 6. Sheet S1.1; Structural Notes (Post Installed Anchors): Please verify all ICC Report Numbers are current. Revise as required. 7. Sheet S2.0 (Plan Note 11); Sheet S4.0 (Detail 105): The plan note indicates 'Do not dowel to footing', while the detail indicates a dowel. Please clarify. 8. Sheet S2.0; General Foundation Notes: Please indicate in Note 3 that the minimum depth of the bottom of foundations shall be 1'-6" below finish grade/finish floor. 9. Sheet S3.0; Roof Framing Plan Notes: Notes 2 and 4 were not located on the plan. Please verify. 10. Sheet D1; Key Notes: Note D5.1 was not located on the plan. Please verify. 11. Sheets A1, A3, A4, and A7; Key Notes: It appears notes at the end of the Key Notes have been lost. Please verify. 12. Sheets A1, A3, A4, and A7; Key Notes: Notes 7.4, 7.5, and 7.7 all reference Sheet A2.1. Please revise the sheet reference. 13. Sheets A1, A3, A4, and A7; Key Notes: Note 15.1 references Detail 8/A3. Please revise the reference. 14. Sheet A3; East Elevation: A dimensioned detail of a window is indicated in the existing building. Is this a new window in the existing building or in the new addition? Please verify and revise as required. 15. Sheet A5; Door Schedule: Door 112 information can not be read due to overlapping notes. Please revise. 16. General: Please provide two sets of structural calculations for the addition. 17. General: Please provide written responses to all review comments. |
08/21/2017 | JVINCEN1 | FIRE | REVIEW | Approved | |
08/21/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The City of Tucson has adopted the 2012 International Plumbing Code. The use of the 2012 Uniform Plumbing Code is allowed provided an appeal to the building official is filed (see sheet TS1). 2. Verify that the existing drainage piping and fitting materials that will now be located under the proposed addition are included in Table 702.2, IPC 2012. Reference: Section 702, IPC 2012. 3. Clarify the size of the roof drain scuppers; detail 3/A2 shows a 5"x 5" scupper but the calculations on sheet A3 state that 6" wide x 6" high scuppers will be provided. Reference: Section 107.2.1, IBC 2012. 4. Provide secondary (overflow) scuppers that are equal in capacity to the primary scuppers, prevent the depth of water on the roof from exceeding the maximum level if the primary scuppers are blocked, and shall have a terminal end point that is separate from the primary scuppers. Reference: Sections 1101.7, 1108.1 1108.2, and 1108.3, IPC 2012. |
08/21/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
08/21/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide energy code compliance calculations for the additions to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012. 2. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C302.2, C403.2.1, and C403.2.2, IECC 2012 as amended by the City of Tucson, and Section 312.1, IMC 2012. 3. Show that the proposed heat pumps meet the requirements of Sections C403.2.2, C403.2.3, C403.2, and C403.3 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. 4. Provide structural calculations to show that the building structure will safely support the proposed heat pumps. Reference: Section 302.1, IMC 2012. 5. Provide access to the equipment located on the roof. Reference: Section 306.5, IMC 2012. |
08/22/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
09/08/2017 | ROBERT SHERRY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | . |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/12/2017 | QJONES1 | APPROVAL SHELF | Completed |
09/12/2017 | QJONES1 | OUT TO CUSTOMER | Completed |