Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T17CM05787
Parcel: 12701005D

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T17CM05787
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/24/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A-1: Detail 6/A-8 is called out at multiple locations where a partition abuts a column. Detail 6/A-8 is for partitions at a mullion. Verify and revise to reference correct detail.
2. Sheet A-2: Keyed Notes 5, 6 & 7 could not be located on the drawing.
3. Sheet A-4 Elevator Lobby Elevation & Sheet A-6: Elevations 1 & 4 Sheet A-6 appear to be reversed. Verify and revise as necessary.
4. Sheet A-4 Enlarged Reflected Ceiling Plan: Keyed Note 3 could not be located on the drawing.
5. Sheet A-5 Restroom Elevation Keyed Notes: Keyed Notes 13, 14, & 15 could not be located on the drawing.
6. Sheet A-6 Elevations 5, 6, 7, & 8: These elevations are denoted as being applicable for restroom 904. Should this be Restroom 908?
7. Sheet A-6 Detail 9: Soffit detail indicates 2x framing. Verify and indicate on the drawings that the 2x is of material permitted to be used with Type 1A construction. Reference IBC 602.2 & 603
8. Sheet A-6 Elevation 6: Indicate on the drawing the mounting height of the 18" vertical grab bar. Reference ANSI A117.1-2009 Figure 604.5.1
9. Sheet A-8 Detail 14: At the cross brace, indicate on the plans the type, size & number of fasteners to be used.
10. General: Provide written responses for all comments.
09/01/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Plan Sheet E-4 shows the special systems for the third floor. Please clarify.
#2. Panel 9DPB is fed with a 200 amp OCPD in panel 9DP. This is in violation of NEC art. 408.36 and art. 240.4.
Ref: 2012 IBC 107.2.1, 2011 NEC

Final Status

Task End Date Reviewer's Name Type of Review Description
09/06/2017 QJONES1 APPROVAL SHELF Completed
09/06/2017 QJONES1 OUT TO CUSTOMER Completed
09/06/2017 QJONES1 REJECT SHELF Completed