Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM05786
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/22/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A-1 Keynote 14, Details 1 & 5 Sheet A-7: The low wall identified in 1/A-7 by Keynote A is called out in Detail 5/A-7 as a 2x4 wall. Verify and indicate on the plans the 2x4 framing is of material permitted to be used with Type 1A construction. Reference IBC Section 602.2 and IBC Section 603. 2. Sheet A-1 Keynote 17: Keynote 17, ceiling mounted projector references detail 15/A-7. This detail is for a sink base cabinet. Please revise to reference the correct detail. 3. Sheet A-1 Enlarged Reception Desk Plan & Detail 1/A-7: Elevation 3 is denoted in 2 locations. Please revise. 4. Sheet A-1 Breakroom Elevations 9/A-7 & 10/A-7 Elevations on Sheet A-7 are reversed. Please revise. 5. Sheet A-2: In the elevator lobby a sconce light fixture is identified by Keynote 4 as a sconce light fixture. Verify and revise as necessary. 6. Sheet A-2: keynotes 5, 6, &7 could not be located on the drawing. 7. Sheet A-4 Keynote 7, Detail 9/A-6: Soffit detail indicates 2x framing. Verify and indicate on the plans the 2x framing is of material permitted to be used with Type 1A construction. Reference IBC Section 602.2 and IBC Section 603 8. Sheet A-5 Enlarged Restroom & Sheet A-6 Elevations: Elevations 5, 6, 7, & 8 on Sheet A-6 is for Restroom 304. Should these elevations be for Restroom 308? Verify and revise as necessary. 9. Sheet A-8 Detail 14: At the cross brace, indicate on the plans the type, size and number of fasteners to be used. 10. General: Provide written responses to all comments. |
08/31/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/06/2017 | QJONES1 | APPROVAL SHELF | Completed |
09/06/2017 | QJONES1 | OUT TO CUSTOMER | Completed |
09/06/2017 | QJONES1 | REJECT SHELF | Completed |