Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM05769
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/09/2017 | MMORENO1 | ZONING | REVIEW | Approved | |
10/09/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
10/09/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
10/09/2017 | MMORENO1 | ENGINEERING | REVIEW | Passed | |
10/09/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet S5 (Detail 3); Structural Calculations (Sheet B.4): Roof joist RJ1 called out as (2) 2x8 at 24" o.c., while Detail 3 indicates 2x6 at 24" o.c. Please verify. 2. Sheet S5 (Detail 23); Structural Calculations (Sheet B.4): Roof beam RB1 (on east wall) called out as 5 1/8" x 12" GLB in the calculations, while the detail indicates 3-2x12. Is the RB1 indicated on the calculations correct? Please verify. 3. Sheet S6 (Canopy Layout); Structural Calculations (Sheet C.1): The calculations indicate the canopy joists are 1x3x1/8 at 6'-6" o.c.at canopies 'A', 'B', and 'D'. The joists are spaced further apart than 6'-6" at these three canopies. Please verify. 4. General: Please provide written responses to all review comments. |
10/09/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
10/09/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
10/09/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/09/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/13/2017 | ARUIZ1 | WWM | REVIEW | Passed |