Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING-WALKTHRU
Permit Number - T17CM05243
Review Name: RESIDENTIAL - BLDG/ZONING-WALKTHRU
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/07/2017 | ANDREW CONNOR | ZONING | REVIEW | Needs Review | COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1). This site is located in the HO-3 zone (UDC 4.7.12). A single-family residence is a permitted use in this zone (Table 4.8-2). The maximum height of a wall or fence within a perimeter yard shall be six (6) feet (UDC Section 6.6.2.I). The maximum height of a retaining wall is ten (10) feet from design grade and no higher than six (6) feet measured from the top of the retaining portion of the wall (UDC Section 6.6.2.I.2). Full HPZ Review Procedure 1. Applicability The following project types are reviewed for compliance with the applicable standards in accordance with the Full HPZ Review Procedure: a. Grading or the erection or construction of a new structure; b. A permit for any alteration involving the modification, addition, or moving of any part of an existing structure, including signs, that would affect the exterior appearance, except as provided in Section 5.8.8.C, Minor HPZ Review; c. Repairs or new construction as provided for in Section 5.8.8.C, Minor HPZ Review, that the PDSD Director determines shall be approved under the full review process due to the cumulative effect of phased work that would normally be subject to the applicability of the full HPZ review process; d. The construction or enlargement of a parking lot within a HPZ or on a property containing a Historic Landmark; and, e. Exceptions. The following project types are reviewed using the Minor HPZ Review Procedure: installation of solar panels or cisterns or installation of or repairs to a roof. The applicant is proposing a (maximum height) 8' 8' wall to the North and the West with 2' setback to the North property line, and interior walls with a height of 8' 8". Additionally the applicant is replacing windows and doors in front of the structure |
07/07/2017 | ANDREW CONNOR | NPPO | REVIEW | Passed | |
08/14/2017 | KROBLES1 | ENGINEERING | REVIEW | Needs Review | |
08/14/2017 | KROBLES1 | BUILDING-RESIDENTIAL | REVIEW | Needs Review |