Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING-WALKTHRU
Permit Number - T17CM04596
Review Name: RESIDENTIAL - BLDG/ZONING-WALKTHRU
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/12/2018 | AHINES2 | ENGINEERING | REVIEW | Needs Review | |
01/12/2018 | AHINES2 | BUILDING-RESIDENTIAL | REVIEW | Needs Review | |
06/13/2017 | ANDREW CONNOR | ZONING | REVIEW | Reqs Change | COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1). This site is located in the HR-3 zone (UDC 4.7.12). A single-family residence is a permitted use in this zone (Table 4.8-2). See Use Specific Standards 4.9.7.B.6. Full HPZ Review Procedure 1. Applicability The following project types are reviewed for compliance with the applicable standards in accordance with the Full HPZ Review Procedure: a. Grading or the erection or construction of a new structure; b. A permit for any alteration involving the modification, addition, or moving of any part of an existing structure, including signs, that would affect the exterior appearance, except as provided in Section 5.8.8.C, Minor HPZ Review; c. Repairs or new construction as provided for in Section 5.8.8.C, Minor HPZ Review, that the PDSD Director determines shall be approved under the full review process due to the cumulative effect of phased work that would normally be subject to the applicability of the full HPZ review process; d. The construction or enlargement of a parking lot within a HPZ or on a property containing a Historic Landmark. The applicant is proposing a detached structure studio / sleeping quarters 1005 sq. ft. with an overall height of 12' the structure meets all setback and size requirements. However, zoning cannot approve structure until HPZ review has been complete. |
06/13/2017 | ANDREW CONNOR | NPPO | REVIEW | Passed |