Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM04391
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/12/2017 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
06/12/2017 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
06/12/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/16/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Specify that the automatic time out settings for the lavatory faucets are set to deliver no more than 0.25 gallons per cycle. Each cycle shall last for at least 10-seconds for accessibility. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Verify that the temperature mixing valves for the lavatory faucets are listed to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. |
06/16/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
06/16/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/28/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide provisions for a sign or warning label for the new Critical Panel RIC-20 As required per 2011 NEC art. 700.10 |
07/06/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet AD101; Demolition Plan: Keynotes 8 and 10 were not located on the plan. Please verify. 2. Sheet A503; Detail 1: The 2x8 wood joists indicate spacing at 18" o.c. Is this spacing correct? 3. Sheet A503; Detail 3: Please indicate the number and size of connectors at the diagonal bracing to the vertical studs. 4. Sheet A503; Detail 3: Please extend the detail to indicate the diagonal bracing and vertical studs to the structure above, including connector information as required. 5. General: Please provide written responses to all review comments. |
07/06/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/31/2017 | CTREVIL1 | WWM | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/31/2017 | TWEIDEM1 | APPROVAL SHELF | Completed |
07/31/2017 | TWEIDEM1 | OUT TO CUSTOMER | Completed |
07/31/2017 | TWEIDEM1 | REJECT SHELF | Completed |