Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM04315
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/01/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
06/01/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide ventilation for the MDF room. Reference: Section 403.3, IMC 2012. |
06/01/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/01/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
06/01/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet G0.0.1 (Site Location Map); Sheet G0.0.2 (Site Plan): Please provide a last approved site plan with each set (only two sets required). 2. Sheet G0.0.2; Applicable Codes:The 2010 is listed for accessibility. Please revise this to the 2009 ICC/ANSI A117.1. 3. Sheet G9.1.2; GWB Head Conditions B(1): Please provide the metal stud bracing size, how it connects to the partition and structure above (including connection size and quantity). 4. Sheet A1.1.1; Keynotes: Note 05 does not indicate a wall type or give stud size and spacing. Please revise the note. 5. Sheet A4.1.0; Elevation D2: Please provide the horizon5tal grab bar location per the ICC/ANSI Figure 604.5.2. 6. General: Please provide written responses to all review comments. 2. Shee |
06/01/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/01/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
06/01/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/01/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |