| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/04/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 10/04/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 10/11/2019 | IMONSHI1 | ZONING | REVIEW | Approved | |
| 10/15/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet C1; Code Review Checklist: The travel distance to exit indicates 75' maximum. Since there is more than a single exit, the IBC Table 1017.2 indicates a maximum exit access travel distance of 200'. Please verify. 2. Sheet C1; Code Review Checklist: The occupant load calculation indicates 200 SF/occupant for a total of 43 occupants. The IBC Table 1004.5 indicates 100 SF/occupant for industrial areas (the 200 SF/occupant is for Group H-5 manufacturing areas). Please verify the occupant load. 3. Sheet A1; Wall Types: On Wall Type 4, please indicate the gauge of the metal studs, or add a reference that provides that information. 4. Sheet A1; Floor Plan: The plan indicates one restroom with one water closet. Per the IBC Section 2902.2(2) and Table 2902.1, two separate restrooms with one water closet each would be required. Please verify. 5. Sheet S3; Detail 5: Please cut that detail on the foundation plan (Sheet S1). 6. General: Please provide written responses to all review comments. |
| 10/23/2019 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | No site plan provided, comment not resolved. [Second comment: No site plan provided, comment not resolved.] [Initial comment: Show the location of the water meter and backflow preventer serving this property.] |
| 10/23/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | The wall types on Sheet A1 indicate that only the south wall has R-11 insulation while the description on COMcheck notes R-11 continuous insulation on all of the exterior walls. Provide a detail showing how batt insulation is to be applied continuously on all of the walls. Provide a detail showing how the "double bubble radiant heat barrier foil insulation" will be applied. Include the skylights in the COMcheck component descriptions. [Second comment: Revise the submitted COMcheck Envelope Compliance Certificate with envelope assembly descriptions that correspond to the construction shown in the drawings. For example, the exterior walls have no continuous insulation and the R-value of the roof is not specified on the drawings. Specify the U-values and SHGC for the windows and the U-values for the doors on the drawings. Provide the COMcheck Mechanical Compliance Certificate.] [Initial comment: Show that the building envelope and the mechanical design comply with the 2012 International Energy Conservation Code (i.e. submit COMcheck).] |
| 10/23/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. No site plan provided, comment not resolved. [Second comment: No site plan provided, comment not resolved. [Initial comment: Provide a site plan that shows the size, material, and route of the water service to the building.] 2. No site plan provided, comment not resolved. [Initial comment: Provide a site plan that shows the size, material, slope, and route of the building sewer. Show the location of all required cleanouts.] 3. No site plan provided, comment not resolved. [Initial comment: Provide the rim elevation and inverts of the upstream and downstream manholes in the public sewer. Determine if the building requires the installation of a backwater valve.] 4. Comment not resolved. The calculations still refer to the wrong table in the IPC and the roof slope does not agree with the roof plan. The code listing on sheet C1 now indicates that the 2018 IPC; see Section 1106.5, IPC 2018 for instructions for determining the size of the scuppers. [Second comment: Scuppers are weirs, not horizontal pipes running full and the size of the scuppers cannot be determined using Table 1103.6, IPC 2012. Most of the proposed scuppers are undersized. Any roof area (which includes surrounding vertical walls) is greater than 1012 square feet will require a scupper that is wider than 4.0". In addition, Section 1108.2, IPC 2012 requires a secondary overflow to terminate in a different location than the primary roof drain, an impossibility if the primary and secondary scuppers are sharing the same opening in the parapet. [Initial comment: Provide calculations for the roof drainage. Show the dimensions of the scuppers and provide overflow protection.] 5. Comment not resolved. State the size of the downspouts. [Second comment: On sheet A4, a rain gutter is called out for the covered work area but on sheet A3, a scupper and downspout are called out.] [Initial comment: Clarify the roof drainage for the covered work area.] |
| 10/31/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Ref; Plan Sheet E1. (a) The current adopted code for IECC is 2018 not 2012. (b) Provide cut sheets from the manufacturer or provide evidence on the lighting plan that the luminaires call out for any exterior lighting meet the shielding and lamp color temperature limits (3500K) of the Outdoor Lighting Code. 2. Ref; Plan Sheet E2. (a) Verify the available fault current at the electrical service with the utility co. or provide a complete fault current analysis and rate the service and downstream equipment accordingly. (b) Indicate the fuse size and type for the service main disconnect. Be advised that the type will need to correlate with the available fault current. (c) Please locate the drinking fountain, welders, crane hoist outlets on the floorplan. Ref; 2018 IBC sec 107.2.1, 2017 NEC. City of Tucson Commercial Plan Submittal requirements. 2012 Tucson/Pima County Outdoor Lighting Code |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/13/2019 | QJONES1 | APPROVAL SHELF | Completed |
| 11/13/2019 | QJONES1 | OUT TO CUSTOMER | Completed |
| 11/13/2019 | QJONES1 | REJECT SHELF | Completed |