| 05/31/2017 | ENEWCOM1 | FIRE | REVIEW | Needs Review | |
| 05/31/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The minimum font size is 3/32". 2. Provide a site plan that shows the size, material, and route of the water service to the building. 3. Provide a site plan that shows the size, material, slope, and route of the building sewer. Show the location of all required cleanouts. 4. Provide the rim elevation and inverts of the upstream and downstream manholes in the public sewer. Determine if the building requires the installation of a backwater valve. 5. Provide specifications for all of the proposed plumbing fixtures. 6. Provide tempered water for the lavatory using a mixing valve listed to ASSE 1070. 7. Provide a metering faucet for the lavatory. The faucet shall deliver no more than 0.25 gallons per cycle. 8. Show the gas load and developed pipe length for all of the unit heaters. 9. Coordinate pipe sizes shown on the plumbing plan and waste piping isometric. 10. Provide cleanouts for the waste piping. The size of the cleanouts shall equal the size of the pipe. 11. Provide calculations for the roof drainage. Show the dimensions of the scuppers and provide overflow protection. 12. Clarify the roof drainage for the covered work area. |
| 05/31/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Remove references to the IRC. The applicable electrical code is 2011 NEC. #2. Provide a complete one-line diagram. Include the AIC ratings of all the service equipment, complete load calcs in amps. Also include all conduit, conductor, sizes and types, grounding detail. Please consult with TEP for their approval of the service equipment configuration. As the current design does not conform with their SR manual requirements. #3. Provide more detail for the 480/277volt panel shown on the one line. Is it a termination cabinet, or a panel (load center) ? Provide for disconnecting means for the transformer as required per NEC art. 240 and 450. #4. Show branch circuit and panel designations for all EC's, heating and cooling equipment, crane hoist. #5. Provide complete compliance with the TUCSON/PIMA COUNTY OUTDOOR LIGHTING CODE for the exterior lighting. Can be downloaded from www.tucson az.gov/pdsd. Ref: 2012 IBC sec. 107.2.1, 2011 NEC. |
| 05/31/2017 | MMENDIB1 | ZONING | REVIEW | Needs Review | |
| 05/31/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
| 05/31/2017 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Show the location of the water meter and backflow preventer serving this property. |
| 05/31/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Show that the building envelope and the mechanical design comply with the 2012 International Energy Conservation Code (i.e. submit COMcheck). 2. Provide heating and cooling load calculations for the heat pump and for the unit heaters. 3. Verify the balancing information for the heat pump. 4. Show the sequence of operation for the restroom exhaust fan. |
| 05/31/2017 | MMENDIB1 | ENGINEERING | REVIEW | Passed | |
| 05/31/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 05/31/2017 | GERRY KOZIOL | WWM | REVIEW | Completed | P17WX01357 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/31/2017 | KROBLES1 | OUT TO CUSTOMER | Completed |