Permit Number: T17CM04146
Parcel: 11005014C

Review Status: Completed

Review Details: 3RD PARTY REVIEW - COMMERCIAL

Permit Number - T17CM04146
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/01/2017 FRODRIG2 3RD PARTY REVIEW-COMMERCIAL REVIEW Completed
06/01/2017 LOREN MAKUS ENGINEERING REVIEW Passed
06/01/2017 FRODRIG2 3RD PARTY REVIEW-COMMERCIAL AT 3RD PARTY OFFICE Approved
06/02/2017 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Principle Planner

PROJECT: Plaza Palomino - Façade Improvements
T17CM04146
Building Plan (1st Review)

TRANSMITTAL DATE: June 2, 2017

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Sheet A2.0, 1st Floor Plan provide a sidewalk width dimension from the façade pop-out, called out under detail "D" to the required vehicle overhang, 2'-6" from the face of curb. Per TSM 7-01.4.3.A the minimum clear width for the sidewalk is 4'-0".

3. Per UDC Article 7.4.6.D.2.b Minimum Width Requirement When Adjacent to Barrier. A motor vehicle off-street parking space must have a minimum width of ten feet when the side(s) of the parking space abuts a vertical barrier over six inches in height, other than a vertical support for a carport. That said the 8'-6" vehicle parking spaces adjacent to the planters shown on the 1st Floor Plan sheet A2.0 does not meet this requirement.

4. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

Final Status

Task End Date Reviewer's Name Type of Review Description
06/02/2017 ARUIZ1 OUT TO CUSTOMER Completed