Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM03779
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/12/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
05/12/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that there is an exhaust fan in the existing restroom that moves air at a minmimum of 50 CFM. 2. Provide an exhaust fan for the new restroom the moves at least 100 CFM and operates whenever the AC is delivering air to the room. |
05/12/2017 | WILDAN | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
05/12/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
05/12/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/12/2017 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Clarify the location of the activity. 2. Show the location, size, and serial number of the water meter serving this suite. 3. Show the location of the backflow preventer associated with the water meter. |
05/12/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a metering faucet for each restroom lavatory. The faucet shall deliver 0.25 gallons per cycle and each cyccle shall last at least 10-seconds (e.g. a flow rate of 0.5 GPM for 30-seconds delivers 0.25-gallons). 2. Provide a mixing valve listed to ASSE 1070 for the water supply to the lavatories. |
05/12/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
05/18/2017 | GERRY KOZIOL | WWM | REVIEW | Completed |