Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM03536
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/15/2017 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 06/16/2017 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Table 105.6.8 of the 2012 International Fire Code limits the amount of oxygen storage allowed (504 cubic feet at NPT) before special requirements become mandatory. Please provide proposed quantity of O2. Also, please provide detail of how oxygen bottles will be secured. |
| 06/19/2017 | WILDAN | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | 20. Sheet E2,3 & 4. North arrow does not match all other plan sheets. Please verify directional orientation of the building and revise as necessary for consistency throughout the plan set. 21. Sheet E2 Power Layout. Electric Panels HP-1 and HP-2 are not provided with the minimum required working space of 30" X 36". Reference NEC 110.26. 22. Sheet E2 Power Layout. The font in the General Notes and Keynotes is very light and difficult to read. Please darken font. 23. Sheet E2A Roof Power Plan. The font in the General Notes is very light and difficult to read. Please darken font. 24. Sheet E2A Roof Power Plan. The font in the Conduit and Wire Schedule is very small and difficult to read. The City of Tucson requires text to be a minimum of 3/32" in size. Please enlarge. 25. Sheet E3 Lighting Layout. The font in the General Notes is very light and difficult to read. Please darken font. 26. Sheet E3 Lighting Layout. The Floor Plan has overlapping text and symbols making it very difficult to read/review. Please revise. 27. Sheet E3 Lighting Layout. The ceiling grid is very dark and blends with light fixtures making it very difficult to review. Please lighten ceiling grid layout. 28. Sheet E4 Special Systems Floor Plan. The font in all Notes is very light and difficult to read. Please darken font. 29. Sheet E4 Special Systems Floor Plan. Wall mounted Data/Telephone outlet is in the middle of the Treatment area away from walls. Please verify location and revise as necessary. 30. Sheet E4 Special Systems Floor Plan. Symbol P is denoted in multiple locations but could not be found in the legend on Sheet E1 or notes on Sheet E4. Please identify. 31. Sheet E6 Single Line & Calculations. The font in the General Notes is very light and difficult to read. Please darken font. |
| 06/19/2017 | WILDAN | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 17. Sheet M2 Mechanical Schedules. Please include the required exhaust ventilation for the kennel area, dog ward, cat ward and isolation room in the outdoor air calculations for HP-1. 18. Sheet M2 Mechanical Schedules. An occupancy category of Office was used in the calculation of required outside air for the Kennel, Dog Ward, Cat Ward and Isolation rather than Specialty Pet Shops (animal shops). Please update calculations to reference the correct occupancy category. Reference IMC Table 403.3. 19. Sheet M2 Mechanical Schedules. An occupancy category of Office was used in the calculation of required outside air for the Pre-Op, Surgery and Post-Op. Please update calculations to reference the correct occupancy category. Reference IMC Table 403.3. |
| 06/19/2017 | WILDAN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet C1, Applicable Codes. Please include ANSI A117.1-2009. 2. Sheet A1, Referenced Floor Plan. Wall Types note (see details A and B for anchorage) could not be located. 3. Sheet A1, Reference Floor Plan. Please provide wall details which include anchoring, bracing and attachment to structure above. Please include type, size and number/spacing of bracing material, anchors and fasteners. 4. Sheet A1, Referenced Floor Plan. One water closet per 25 occupants is required for the first 50 occupants and one per 50 of the remaining for both male and female. Separate facilities shall be provided for both male and female. Only 1 restroom for public use is being provided. Please provide one additional restroom for public use. Reference IBC table 2902.1 and IBC 2902.2. 5. Sheet A1, Reference Floor Plan. Wall Type G denotes the installation of additional 2x4. Please verify the additional framing is to be wood 2x4 and not metal studs as denoted in all other wall types. 6. Sheet A1, Reference Floor Plan. Please provide identification of the door located at the end of the corridor near exam room 5 & 6. 7. Sheet A1, Reference Floor Plan. Room 119 OXY. appears to be used for oxygen storage. Please indicate the quantity of oxygen to be stored. 8. Sheet A1, Referenced Floor Plan. Question: is the window located in the exterior wall of the X-Ray room compliant for that use? 9. Sheet A4, Reflected Ceiling Plan. Please provide a detail of the suspended soffit denoted in keynote 5. Include information requested in comment 3. 10. Sheet A4, Reflected Ceiling Plan. Please provide curb details for Skylights H & I. Provide detail for shaft noted in Keynote 6 which includes information requested in comment 3. 11. Sheet A5, Interior Elevations. Provide dimensions which correlate with ANSI A117.1-2009 for details 24 & 25. Reference ANSI A117.1-2009 Figures 604.5.1 & 604.5.2. 12. Sheet A5, Interior Elevations. Grab bars are misidentified by Keynote 9 as mirror in Detail 25. 13. Sheet A5, Interior Elevations. Toilet paper dispensers are misidentified by Keynote 10 as mirror in Detail 25. 14. Sheet A5, Interior Elevations. Water Closet is misidentified as plastic laminate surface by Keynote 13 in Detail 25. 15. Sheet A5, Interior Elevations. Keynote 22 denotes painted gypsum board in Reception area millwork in Details 4,5 & 6. If there is a wall being installed at the millwork, please identify by Wall Type and provide details. Please clarify. |
| 06/19/2017 | CTREVIL1 | WATER | REVIEW | Passed | |
| 06/19/2017 | WILDAN | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 16. Sheets P1 Plumbing Plan & A1 Reference Floor Plan. Location of plumbing fixture P4 on sheet P1 does not match location on sheet A1. Please coordinate and revise. |