Permit Number: T17CM03530
Parcel: 13824023J

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T17CM03530
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/28/2017 MARTIN BROWN FIRE REVIEW Reqs Change From sheet A1.0, unable to locate door 105C on door schedule page.
Please include fire sprinklers, fire sprinkler underground, fire alarms, and kitchen exhaust hood fire supression system to list of deferred submittals.
Provide response letter
06/30/2017 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T17CM03530 - New Food Service Use - IHOP Restaurant
Building Plans (2nd Review) Related DP17-0040
375 West Blacklidge - O-3 / C-3 Zone

TRANSMITTAL DATE: June 30, 2017

DUE DATE: July 21, 2017

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. COMMENT: Zoning has reviewed the building plans but cannot approve them at this time. As of this 2nd building plans review, the development package related to this development has not been approved by all PDSD Plans reviewers. Zoning has verified that the building plan is in compliance with the current version of the DP as it relates to the zoning review purview, which includes the building square footage, building height, building footprint, and location on the site.

2. COMMENT: The cover sheet of the building plans includes a copy of the DP site plan sheet which is outdated. Revise the cover sheet to include a copy of the most current or approved and signed version of the DP site plan.

3. COMMENT: If any changes are necessary, due to the PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning.

4. COMMENT: Once the plans have been reviewed and approved by the Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning.

If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans and current or approved version of the DP as reference.
07/07/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change The email and hood cut-sheets do not answer the question regarding the two large openings (9'-5" x 1'-8") behind the three type I hoods. The plan view of the three hoods on the Captiveaire shop drawing (sheet M4.1) has a note regarding the need for the correct construction of the end walls to avoid nullifying the ETL listing. Provide a revised shop drawing from Captiveaire that shows the pass-through openings and that indicates any needed modification of the exhaust flow requirements. [Initial comment: The partition behind the three Type I hoods has large pass-through openings. Verify that the proposed wall canopy hoods are listed for this application. Reference: Sections 507.1 and 507.13, IMC 2012.]
07/07/2017 ROBERT SHERRY WATER REVIEW Reqs Change No civil site utility drawing, as noted in the reply to the initial comment, is included in the document set. [Initial Comment: Provide a site drawing showing the size and route of the building water supply along with the location of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2012.]
07/07/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. No civil site utility drawing, as noted in the reply to the initial comment, is included in the document set. [Initial Comment: Provide a site drawing showing the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2012.]
2. No response included with the resubmittal. [Initial Comment: The foodservice equipment schedule shows the dishwasher, K-77, equipped with a booster heater. Verify that the discharge from the dishwasher will be 140 degrees Fahrenheit or less. Reference: Section701.7, IPC 2012.]
07/17/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A1.0 (Floor Plan); Sheet A7.0 (Door Schedule): The exit door 105C (on the east side of the building) indicates an interior door in the door schedule. Please revise and verify the door hardware (Type 2 on Sheet A7.1). Does this require panic hardware?
2. Previous Comment 20: Please provide a Special Inspection Certificate for site preparation, reinforced concrete, structural masonry, structural welding, expansion anchors, and epoxy anchors. See Sheet S3.3.
3. Previous Comment 21: Please provide one copy of the soils report (as indicated on Sheet S3.3) for review.
4. General: Please provide written responses to all review comments.
07/19/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
07/25/2017 ARUIZ1 WWM REVIEW Needs Review