Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/02/2017 | STEVE SHIELDS | ZONING | REVIEW | Passed | |
05/02/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/16/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide tempered water for the restroom lavatory using an approved device conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. 2. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 3. Verify that the pipe sizes called out for the water closet flush valve will not result in water velocities greater than that recommended by the pipe manufacturer (e.g. limit the water velocity to less than 8 FPS for copper, PEX, or CPVC piping). At a minimum design flow rate of 25 GPM for a siphonic, flush-valve water closet, a 1" Type L copper pipe has a flow velocity of 9.7 FPS. Reference: Table 604.3, IPC 2012. 4. The specified eyewash requires a minimum of 30-PSI flowing water pressure for proper operation; verify that this is available. Reference: Section 605.3, IPC 2012 as amended by the City of Tucson and ANSI Z358.1. 5. Verify that the developed length of the hot water supply piping from the hot water source (i.e. a recirculating hot water system) to the furthest sink is no more than fifty feet. Reference: Section 607.2, IPC 2012. |
05/16/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
05/17/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide calculations demonstrating adequate ventilation. Reference: Section 403.2, IMC 2012. |
05/22/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A0.03; Toilet Grab Bar: A vertical grab bar is required on the sidewall per the ICC/ANSI Figure 604.5.1. Please add. 2. Sheet A0.03; Roll in Shower Grab Bars/Controls: Please verify the grab bars/control/handshower locations are in conformance with the ICC/ANSI Section 608. 3. Sheet A1.21; Basement Level Plan: Please provide a north arrow on the plan. 4. Sheet A2.12; Floor Plan Keyed Notes: Note 1 indicates to infill corridor walls with a one hour fire resistant rated assembly. Please provide a reference in the note to Sheet A4.10 for partition types and fire resistance ratings. 5. Sheets A2.12, A2.22, A2.32, A2.42, and A2.52; Floor Plan Keyed Notes: Note 3 indicates the general contractor shall verify the fire resistance rating of an existing wall and modify the wall as required to achieve a one hour rating. The architect of record is required to make that determination of the fire resistance rating of the walls. Please revise the note. Reference Sheet A4.10 on the drawings for partition types and fire resistance ratings. 6. Sheets A2.12, A2.22, A2.32, A2.42, and A2.52; General Floor Plan Notes: Please add a note at these sheets to reference Sheets A5.10 and A5.11 for special details at the fire resistant rated assemblies. 7. Sheets A2.14, A2.24, A2.34, A2.44, and A2.54; Equipment Plans: Please verify on the drawings the hazardous materials meet the requirements of the IBC Sections 307 and 414 for quantities, storage, control areas, etc. 8. Sheet A4.10; Rated Fire/Smoke Partition Elevation: Several section cuts reference Sheet A4.01. Please revise. 9. Sheet S1.1: Please provide structural calculations from the engineer of record for the new opening supports. 10. General: Please provide written responses to all review comments. |
05/23/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comment. Also provide a written response. Please provide full compliance with the 2012 IECC for the lighting. |