Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T17CM03153
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/27/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
| 07/27/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the envelope compliance to indicate that reduced interior lighting has been used to comply with Section C406, IECC 2012. Verify the U-value and SHGC-valuues of the proposed glazing. [Initial comment: Demonstrate energy code compliance for the building envelope (i.e. submit an envelope compliance certificate from COMcheck) using calculations based on the current code - the note on sheet A7.3 appears to reference Chapter 8 of the 2003 IECC. ]Reference: Sections C101.3, C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2012.] 2. Provide a programmable thermostat the provides the required capabilities. [Initial comment: Verify that the specified HVAC systems are provided with controls that are capable of automatically adjusting the start time of the HVAC equipment in order to bring the interior conditions to the desired temperature at the start of occupancy. Reference: Section C403.2.4.3.3, IECC 2012.] 4. Specify the the minimum height of the exhaust discharge ( Section 506.3.13.1, IMC 2012). [Initial comment: Provide details showing how exhaust fans EF-1 and EF-2 and their associated grease ducts are to be installed. Include all required clearance dimensions. Shop drawings are not an acceptable substitute for sealed engineering drawings.] Reference: Sections 506.3.8, 506.3.11, 506.3.13, and 506.5, IMC 2012 and Section 107.2.1, IBC 2012.] |
| 07/27/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | No comments |
| 07/27/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Show that the proposed use of a 4" 2-way cleanout will not cause damage to the 3" ABS pipe. [Initial comment: Provide cleanouts sized for the nominal size of pipes that they serve up to 4-inches. The 4" grease waste starting in the kitchen requires a cleanout. Reference: Section 708.7, IPC 2012.] |
| 07/27/2017 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | The water demand calculations indicate a future demand that will increase the demand beyond the 37.5 GPM that Tucson Water allows for a 1" water meter. [Initial comment: Tucson Water limits 1" water meters to maximum demand of 37.5-GPM. Provide a letter from Tucson Water confirming that the use of a 1" water meter is allowable for this project.] |
| 07/27/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 08/29/2017 | QJONES1 | WWM | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/29/2017 | QJONES1 | APPROVAL SHELF | Completed |
| 08/29/2017 | QJONES1 | OUT TO CUSTOMER | Completed |
| 08/29/2017 | QJONES1 | REJECT SHELF | Completed |