Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T17CM03120
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/28/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/28/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
07/06/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Delete the remarks for hand sink (17) in the Plumbing Schedule; the hand sink is to be directly connected to the sanitary drain as shown on the plumbing plan. Reference: Section 301.3, IPC 2012. 2. Provide pressure-absorbing devices (ASSE 1010) for the water connections to the glassware washer per the manufacturer's installation instructions. Reference: Sections 303.2 and 604.9, IPC 2012. 3. Verify that the discharge from the glassware washer (kitchen equipment number 15) will be 140 degrees Fahrenheit or less. Reference: Section701.7, IPC 2012. 4. Verify the capacity of the specified water heater. The A.O. Smith model DEL-50 probably has a capacity less than 50 gallons. |
07/12/2017 | KROBLES1 | WWM | REVIEW | Needs Review |