Permit Number: T17CM03080
Parcel: 11005318J

Address:
3001 N SWAN RD

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T17CM03080
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/18/2017 JVINCEN1 FIRE REVIEW Approv-Cond Panic hardware required on "exits" other than the main exit.
05/25/2017 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Principle Planner

PROJECT: Shell Building - NWC Swan & Ft. Lowell
T17CM03080
Building Plan (1st Review)

TRANSMITTAL DATE: May 25, 2017

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Until development package DP17-0080 is approved the building plans cannot be approved.

3. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
05/25/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A2.0; Keynote 4: This note references details 1, 2, and 3 on Sheet A5.0 for the drive thru window. Please revise the detail references.
2. Sheet A4.0; Building Sections 1, 2, and 3: A foundation detail 11/S2.1 is indicated on all building sections. Please revise the detail reference.
3. Sheet A5.0; Storefront Window Elevations: Window details 1/A5.0 and 2/A5.0 are indicated on Elevation SE5. Please revise both detail references.
4. Sheet A6.0: Two details are identified as Detail 2. Please verify.
5. Sheet A6.0; Wall Section 3: Please complete the detail reference and revise the detail reference.
6. Sheet S1.0 (Foundation Plan); Structural Calculations (Page 18): Wall W-2 in the calculations at the southwest corner of the building indicates HTT5 holdowns at each end of the wall. The drawings do not indicate those holdowns. Please coordinate.
7. Sheet S1.0 (Footing Schedule); Structural Calculations (Page 17): The calculations indicate footing F-4 is reinforced with 5-#5 each way, while the footing schedule (F-3) is reinforced with 4-#5 each way. Please coordinate.
8. Sheet S3.0; General Notes: Please verify the wind load exposure "BC" and the seismic design category "C" for Tucson.
9. General: Please provide Special Inspection Certificates for foundation/excavation, reinforced concrete, and field welding.
10. General: Please provide written responses to all review comments.
05/26/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide the site plan noted on sheet P1.0 that will show the route, slope, and termination of the building sewer as well as the location of the water meter and backflow protector. Reference: Section 107.2.1, IBC 2012.
2. Provide a vent downstream of the gravity grease separator to protect the seal for the grease separator. Since all of vents (except for vents serving interceptors located outdoors) must rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally, clarify how this will be accomplished. Reference: Sections 905.4 and 1003.9, IPC 2012.
05/26/2017 ROBERT SHERRY WATER REVIEW Completed
05/30/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide energy code compliance calculations for the building envelope. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012.
2. Show how one of the "Additional Efficiency Package Options" (C406, IECC 2012) is to be accomplished. Reference: Section C401.2, IECC 2012.
3. Provide the heating and cooling load calculations used to determine the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012.
06/02/2017 LOREN MAKUS ENGINEERING REVIEW Reqs Change DP must be approved first.
06/06/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
06/07/2017 KROBLES1 WWM REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
06/07/2017 KROBLES1 OUT TO CUSTOMER Completed