Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T17CM03080
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/18/2017 | JVINCEN1 | FIRE | REVIEW | Approv-Cond | Panic hardware required on "exits" other than the main exit. |
| 05/25/2017 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Principle Planner PROJECT: Shell Building - NWC Swan & Ft. Lowell T17CM03080 Building Plan (1st Review) TRANSMITTAL DATE: May 25, 2017 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Until development package DP17-0080 is approved the building plans cannot be approved. 3. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 05/25/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A2.0; Keynote 4: This note references details 1, 2, and 3 on Sheet A5.0 for the drive thru window. Please revise the detail references. 2. Sheet A4.0; Building Sections 1, 2, and 3: A foundation detail 11/S2.1 is indicated on all building sections. Please revise the detail reference. 3. Sheet A5.0; Storefront Window Elevations: Window details 1/A5.0 and 2/A5.0 are indicated on Elevation SE5. Please revise both detail references. 4. Sheet A6.0: Two details are identified as Detail 2. Please verify. 5. Sheet A6.0; Wall Section 3: Please complete the detail reference and revise the detail reference. 6. Sheet S1.0 (Foundation Plan); Structural Calculations (Page 18): Wall W-2 in the calculations at the southwest corner of the building indicates HTT5 holdowns at each end of the wall. The drawings do not indicate those holdowns. Please coordinate. 7. Sheet S1.0 (Footing Schedule); Structural Calculations (Page 17): The calculations indicate footing F-4 is reinforced with 5-#5 each way, while the footing schedule (F-3) is reinforced with 4-#5 each way. Please coordinate. 8. Sheet S3.0; General Notes: Please verify the wind load exposure "BC" and the seismic design category "C" for Tucson. 9. General: Please provide Special Inspection Certificates for foundation/excavation, reinforced concrete, and field welding. 10. General: Please provide written responses to all review comments. |
| 05/26/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the site plan noted on sheet P1.0 that will show the route, slope, and termination of the building sewer as well as the location of the water meter and backflow protector. Reference: Section 107.2.1, IBC 2012. 2. Provide a vent downstream of the gravity grease separator to protect the seal for the grease separator. Since all of vents (except for vents serving interceptors located outdoors) must rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally, clarify how this will be accomplished. Reference: Sections 905.4 and 1003.9, IPC 2012. |
| 05/26/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 05/30/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide energy code compliance calculations for the building envelope. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012. 2. Show how one of the "Additional Efficiency Package Options" (C406, IECC 2012) is to be accomplished. Reference: Section C401.2, IECC 2012. 3. Provide the heating and cooling load calculations used to determine the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. |
| 06/02/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | DP must be approved first. |
| 06/06/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 06/07/2017 | KROBLES1 | WWM | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/07/2017 | KROBLES1 | OUT TO CUSTOMER | Completed |