Review Date Reviewer's Name Type of Review Description Status Comments
05/05/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Verify that the existing demising wall by hood KH-1 is constructed with non-combustible supports. Reference: Section 507.9, IMC 2012.
2. Include the structural details that show how both of the Type I hoods and the new AC units will be supported from the building structure. Verify with the manufacturer that the method of support is appropriate for hood KH-2. Reference: Section 302.1, IMC 2012.
3. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012.
05/05/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Verify the required gas input for the XLT 3240 triple conveyor oven. The manufacturer's literature indicates an input of 88 MBH per standard oven (122MBH for a high performance oven) for a total input of 264 MBH (or 366 MBH for three high performance ovens), not two inputs of 120 MBH. Reference: Section 402.2, IFGC 2012.
2. Verify the required gas input for the two fryers; the drawings show an input of 160 MBH but it is unclear if the requirement is for two fryers or for each fryer. Reference: Section 402.2, IFGC 2012.
3. Where does the electric water heater (detail 201) occur?
4. Provide the manufacturer's installation requirements for the N-922 dishwasher.
05/09/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet T1.0; Project Summary: Please include a code analysis on this sheet which includes the total occupant load for this tenant space.
2. Sheet T1.0; Project Summary: Please add the 2009 ICC/ANSI A117.1 accessibility code to this sheet.
3. Sheet A1.0; Floor Plan: Per the IBC Section 1210.4, toilet rooms shall not open directly into a room used for the preparation of food for service to the public. Please verify.
4. Sheet A1.0 (Floor Plan); Wall Types: It is not clear on the floor plan how the new walls are identified in the wall types. Please clarify on the drawings which walls are new, which walls are existing, and the specific wall type for all new walls.
5. Sheet A4.1; Elevation 7: It appears the elevation is not consistent with the ICC/ANSI Figure 604.5.2 (the location of the horizontal grab bar does not meet the minimum 12" dimension). Please verify.
6. Sheet A8.0; Detail 4: Please specify on the detail the type, size and spacing of the fasteners at the bottom of the wall as referenced.
7. Sheet A8.0; Detail 1: Please provide the metal stud bracing size, and indicate the number and size of connectors to the vertical studs.
8. Structural Calculations; Recommendation 2: Please incorporate the structural Detail S1 on to the full sized drawings.
9. Structural Calculations; Recommendation 2: Please provide the mechanical curb detail on the full sized drawings as recommended in the calculations.
10. General: Please provide written responses to all review comments.
05/11/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following 2nd electrical plan review comment. Also provide a written response.
#1. There were no changes or corrections made to the plan documents, nor was a written response found as requested per the last plan review comment.
05/18/2017 GERRY KOZIOL WWM REVIEW Approved