Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM02517
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/06/2017 | MARTIN BROWN | FIRE | REVIEW | Needs Review | |
04/21/2017 | ROBERT SHERRY | WATER | REVIEW | Needs Review | |
04/21/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Needs Review | DP must be approved first. |
04/25/2017 | PIMA COUNTY | BUILDING-COMMERCIAL | REVIEW | Reqs Change | T17CM02517 –PLAN REVIEW COMMENTS (BUILDING 2) BUILDING – COMMERCIAL Reviewer: Chris Anderson, April 24, 2017 Detail 1/A3.6 does not comply with Code requirements. The weep screed must be located at or below the foundation plate line and minimum 2” above the concrete surface. The weep screed in this detail is not located at or below the foundation plate line. Provide a concrete or solid grouted cmu foundation curb to comply. Ref. 2012 IBC 2512.1.2. Regarding structural detail 123/S5.2, see item 1 above. Keynote 2 for the Mechanical Plan – Building 2 on sheet M2.1 states that new 4-ton RTU’s will replace existing 3-ton RTU’s. Has the existing roof structure been evaluated for capacity to accommodate the supposed added weight? |
04/25/2017 | PIMA COUNTY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | PLUMBING - COMMERCIAL Reviewer: Chris Anderson, April 21, 2017 Change title for sheet P2.2 to “Plumbing Floor Plan Building 2.” On Plumbing Fixture Schedule, sheet P6.1, please verify that the proposed faucets for LAV and WF-1 will dispense no more than .25 gallon per metering cycle per City of Tucson amendment to the 2012 IPC. |
04/25/2017 | PIMA COUNTY | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | ELECTRICAL - COMMERCIAL Reviewer: Chris Anderson, April 24, 2017 On sheet E5.1 change title to “Panelboard Schedules Building 2.” |
04/25/2017 | PIMA COUNTY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | MECHANICAL - COMMERCIAL Reviewer: Chris Anderson, April 24, 2017 On the Packaged Pump Schedule – Building 2, sheet M5.1, the cooling ambient air dry bulb is shown as 107-degrees F summer design temperature. Per City of Tucson amendment to the 2012 IECC, the summer Db design temperature must be 104-degrees F. Revise schedule and reselect heating and cooling unit if needed to comply. Provide heating and cooling load calculations summary sheets to justify the capacity of selected equipment. Ref. 2012 IECC C403.2.1 and C403.2.2. Use 104-degrees F summer DB outdoor design temperature with 66-degrees F design wet bulb temperature, and 32-degrees F winter DB outside design temperature per City of Tucson amendment to the 2012 IECC. Per IECC C403.2.1 and C403.2.2 “the output capacity of heating and cooling equipment and systems shall not exceed the lo |
04/28/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/28/2017 | GERRY KOZIOL | WWM | REVIEW | Reqs Change | The following is needed for Sewer Connection Fee Application Approval: Need civil drawing showing location of connection to the existing on-site private sewer and need to show location, size and serial number of all water meters on the property. PCRWRD & COT Water indicate only one existing 1-1/2” water meter #13738862 on this property. (user fees since 2008). Do buildings #1, #2 and #3 all connecting to this existing 1-1/2” water meter? *Drawing P3.1 indicates a new 1-1/2” water meter for new building #4. Fee: $27,030.00. Need to clarify building numbers on drawings. Some do not match. *In particular buildings #3 & #4 Need Type III Capacity from Kurt Stemm – 520-724-6607. |