Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM02475
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/30/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
| 03/30/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Verify that no nail polish will be applied at the pedicure chair locations or provide source-capture exhaust. |
| 03/30/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 03/30/2017 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved | |
| 03/30/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A3.0; RESTROOM PLAN 1: PER THE ICC/ANSI FIGURE 404.2.3.5 (c), THERE MUST BE A MINIMUM MANEUVERING CLEARANCE OF 12" ON THE PUSH SIDE OF THE DOOR. IT DOES NOT APPEAR THAT REQUIREMENT IS MET. PLEASE VERIFY AND INDICATE ON THE PLAN (THE DOOR SWING IS SHOWN TWO DIFFERENT WAYS). iF THE DOOR SWINGS INTO THE CORRIDOR, PLEASE VERIFY THE EGRESS WIDTH REQUIRED IS STILL OK. 2. SHEET A5; DETAIL 16: THIS DETAIL INDICATES A 30 GALLON HOT WATER HEATER, WHILE THE PLUMBING SHEET INDICATES A 50 GALLON. PLEASE COORDINATE. |
| 03/30/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 03/30/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 03/30/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/30/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 06/13/2017 | GERRY KOZIOL | WWM | REVIEW | Completed |