Permit Number: T17CM02367
Parcel: 13348128F

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T17CM02367
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/03/2017 JVINCEN1 FIRE REVIEW Approved
05/03/2017 GERRY KOZIOL WWM REVIEW Passed
05/03/2017 DAVID RIVERA ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Principle Planner

PROJECT: Galaxy Theater
T17CM02367
Building Plan (1st Review)

TRANSMITTAL DATE: April 13, 2017

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. There appears to be a sign element that may constitute a building wall. This wall exceeds the allowed building height within the scenic corridor, see UDC Section 5.3.5 and figure 5.3-C. A determination by the Zoning Administrator may be required.

3. The development package sheet provided in the building plan set will either need to be the approved signed set, marked as reference only or removed from the building plans.

4. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
05/03/2017 DAVID RIVERA ZONING REVIEW Reqs Change FROM: Steve Shields
Principle Planner

PROJECT: Galaxy Theater
T17CM02367
Building Plan (1st Review)

TRANSMITTAL DATE: April 19, 2017 Amended comment 2.

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. There appears to be a sign element that may constitute a building wall. This wall exceeds the allowed building height within the scenic corridor, see UDC Section 5.3.5 and figure 5.3-C. (A determination by the Zoning Administrator may be required.)

Due to the overall height (40 feet) of the structure proposed for the new Galaxy sign excluding the five feet (Stars embellishment - per Zoning Administrator's determination) above the proposed structure's parapet wall, a Board of Adjustment Variance approval will be required for the additional 10 feet above the allowable building height of 30 feet within a Scenic Corridor Overlay, UDC section 5.3.5.A.3.
05/04/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
05/05/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet T-1; General Building Summary: The allowable area is calculated as 48,025 square feet, while the actual area is 55,212 square feet. This indicates the actual square footage is not in compliance with the building code. Please clarify.
2. Sheet T-1: What was the occupancy classification for the previous tenant in this space? Please indicate this on the drawings.
3. Sheet SP-1; Site Plan: It appears the valuation for this project was based on a new shell space. Please verify. If this is an existing building that had a previous tenant, please provide a valuation (labor and materials) for this portion of the project (shell renovation).
4. Sheet A-2; Enlarged Storefront at Vertical Sign Element: Please revise the plan number reference in the title to 2.
5. Sheet A-3; Ramp General Notes: Note 1 should indicate 'not steeper than 1 in 12' (per the IBC Section 1010.3). Please revise.
6. Sheet A-3; Ramps: At all plans on this sheet indicating ramps, please provide the top elevation of the ramp, the slope of the ramp, the length of the ramp, and the bottom elevation of the ramp.
7. Sheet A-12; Sections 1 and 4: Please reference the structural section/detail that indicates how the new foundation is to be constructed at the existing foundation.
8. Sheet A-13; Sections 1, 3, and 4: Please reference the structural section/detail that indicates how the new foundation is to be constructed at the existing foundation.
9. Sheet A-14; Sections 2 and 4: Please reference the structural section/detail that indicates how the new foundation is to be constructed at the existing foundation.
10. Sheet S-1 (Column Schedule); Structural Calculations (Sheet 44): The calculations indicate column 2 base plate is 12" x 12" x 3/4". The column schedule indicates an 8" x 12" x 3/4" base plate. Please coordinate.
11. Sheet S-7; Details 2 and 3: These details indicate a steel pipe guardrail, while the structural calculations indicate a structural tube. Please clarify. Indicate on these details to reference architectural sheet A-5 for the guardrails, or indicate the size on those two details.
12. Structural Calculations (Sheet 26); Sheet A-5 (Guardrail and Handrail Notes): The architectural note indicates guardrails and handrails are 1-1/4" nominal standard pipe. The structural calculations indicate a structural tube 1 1/2" x 1 1/2" x 11 gauge. Please coordinate.
13. General: Please provide written responses to all review comments.
05/09/2017 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
05/11/2017 MMENDIB1 OUT TO CUSTOMER Completed