Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T17CM01914
Parcel: 13017149A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T17CM01914
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/16/2017 MARTIN BROWN FIRE REVIEW Approved
03/24/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Clarify the status of the water meter serving this building. It is noted as being an existing 2" meter on sheet P1.0 but the water calculations call for a new 2" water meter.
2. Provide information to show how the proposed water heater is to be supported from the building structure. Reference: Section 301.2, IPC 2012.
3. Coordinate the specifications for fixture P-3 with the architect. P-3 is called out as a floor-level mop sink but on sheet A2.0 it is a 36"- high laundry tub. Reference: Section 107.2.1, IBC 2012.
4. Clarify the location of the water heater and show how it is to be accessed for maintenance. Reference: Sections 501.4 and 502.5, IPC 2012.
03/24/2017 ROBERT SHERRY WATER REVIEW Completed
03/24/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Alterations of an existing building in which the existing ceiling or wall cavities are exposed, shall have the exposed cavities filled with insulation. Insulation installed on a lay-in ceiling is not to be considered as being part of the minimum required thermal insulation for the roof. Reference: Sections 101.4.3 and C402.2.1, IECC 2012.
2. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012.
3. Provide the mechanical energy code compliance certificate from COMcheck. Reference: Section C303.1, International Energy Conservation Code 2012.
4. Verify that the parapet height within ten feet of heat pump HP-7 is at least 42" above the walking surface of the roof or provide guards for the unit per Section 304.11, IMC 2012.
5. Show how adequate access is being provided for the equipment located on the roof. Reference: Section 306.5, IMC 2012.
04/03/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET A2.0; CODE INFORMATION (OCCUPANCY LOAD): WHAT DOES THE DOUBLE ASTERISK REFERENCE? PLEASE VERIFY.
2. SHEET A2.0; CODE INFORMATION (OCCUPANCY LOAD): WHY DO THE OCCUPANCY LOADS INDICATED IN THIS TABLE DIFFER FROM THE OCCUPANCY CALCULATIONS BELOW? PLEASE VERIFY.
3. SHEET A2.0; TUCSON BUILDING CODES: PLEASE ADD THE 2009 ICC/ANSI A117.1 ACCESSIBILITY CODE TO THIS SECTION.
4. SHEET A2.0; FLOOR PLAN KEY NOTES: PLEASE CLARIFY NOTE 10. IT IS INDICATED IN AT LEAST TWO INTERIOR WALLS.
5. SHEET A2.0; PARTITION LEGEND: THE TITLE NOTE INDICATES "ALL MAY NOT APPLY-THIS PROJECT". PLEASE REMOVE THE NOTE AND ALL PARTITION TYPES NOT USED ON THIS PROJECT.
6. SHEET A2.0; CODE INFORMATION: THE TOTAL SQUARE FOOTAGE OF THE OFFICE/WAREHOUSE OCCUPANCIES (PER THE TABLE IN THE CODE INFORMATION) IS 10,359 SQUARE FEET. PER THE IBC TABLE 503, THE ALLOWABLE SQUARE FOOTAGE FOR A 'B' OR 'S-1' OCCUPANCY CLASSIFICATION WITH VB NON-SPRINKLERED CONSTRUCTION IS 9000 SQUARE FEET. NO RATED INTERIOR PARTITIONS ARE IDENTIFIED, AND NO INDICATION OF AN INCREASE IN THE ALLOWABLE AREA FOR FRONTAGE (IBC SECTION 506.2) IS SHOWN ON THE DRAWINGS. PLEASE INDICATE ON THE DRAWINGS HOW THE ACTUAL SQUARE FOOTAGE MEETS THE CODE REQUIREMENT.
7. SHEET A2.0; CODE INFORMATION: PLEASE COMPLETE THE 'AGE OF BUILDING' STATEMENT ON THE DRAWING.
8. SHEET A3.0; DETAIL 1: PLEASE REVISE THE GAUGE OF THE METAL PARTITION STUDS.
9. SHEET A3.0; DETAILS: ADD A DETAIL NUMBER TO THE RESTROOM ADA HEIGHTS AND THE RESTROOM/EXIT SIGNAGE DETAILS.
10. SHEET A3.0; DETAILS 14, 15, AND 16: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE THE DETAIL NOTES.
11. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
04/07/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
04/21/2017 GERRY KOZIOL WWM REVIEW Approved