Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM01870
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/09/2017 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 03/09/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/21/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 03/22/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Show the location of the required drinking fountains. Reference: Section 2902, IBC 2012. 2. Provide calculations to support the scupper design (detail 7/A3) and provide overflow protection for the roof or provide structural calculations to show that the roof is capable of supporting the additional rain load. Reference: Sections 1101.7, 1106, 1108.2 and 1108.3, IPC 2012 and Section 1611.1, IBC 2012. |
| 03/22/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide energy code compliance calculations for the additions to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012. 2. Coordinate the heating and cooling load calculations, using the same unit tags on the calculations as the unit schedules. Provide unique labels for the existing rooftop units for use on the load calculations as well as on the ventilation calculations. Reference: Section 107.2.1, IBC 2012. |
| 03/30/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET TS1; CODE STUDY (AREA): THE ALLOWABLE AREA SHOULD INDICATE THE FIGURE FROM THE IBC TABLE 503 FOR A 'B' OCCUPANCY GROUP, NOT THE EXPANSION AREA. PLEASE REVISE. 2. SHEET TS1; CODE STUDY (AREA): THE ALLOWABLE INCREASES TO THE BUILDING AREA SHOULD INDICATE THE 300% INCREASE PER THE IBC SECTION 506.3, THUS REVISING THE ALLOWABLE AREA TO (3 X 9000) + 9000 = 36,000 SF. PLEASE REVISE ON THE DRAWINGS. 3. SHEET TS1; SPECIAL INSPECTION: THERE ARE NO ADDITIONAL SPECIAL INSPECTIONS INDICATED ON SHEET S1.0 AS NOTED. PLEASE REMOVE THE NOTE. 4. SHEET D1; KEY NOTES: IS THE NOTE D15.1 (EXISTING WATER HEATER) CORRECTLY LOCATED IN THE SOUTHEAST CORNER OF THE BUILDING (JANITOR'S CLOSET)? PLEASE VERIFY. 5. SHEET A1; ENLARGED TOILET PLAN: IN THE SHOWER, AN INTERIOR ELEVATION REFERENCES 2D/S7. PLEASE REVISE THE SHEET REFERENCE. 6. SHEET A3; KEY NOTES: NOTE 15.9 IS INDICATED ON THE ROOF PLAN (SEVERAL LOCATIONS) BUT IS NOT INDICATED IN THE KEY NOTES. PLEASE VERIFY. 7. SHEET A7; ELEVATION 2D: FOR THE TRANSFER-TYPE SHOWER, PLEASE INDICATE THE REQUIRED VERTICAL GRAB BAR AND THE CONTROL/HANDSHOWER LOCATIONS PER THE ICC/ANSI FIGURE 608.4.1. 8. SHEET A7; ELEVATION 2B: PLEASE INDICATE THE LOCATION OF THE TOILET PAPER DISPENSER PER THE ICC/ANSI FIGURE 604.7. 9. SHEET S1.0; STRUCTURAL NOTES: PLEASE INCLUDE WIND AND SEISMIC DESIGN REQUIREMENTS IN THE NOTES (WIND SPEED, SEISMIC ZONE, ETC.). 10. SHEET S1.0; GENERAL STRUCTURAL: PLEASE PROVIDE STRUCTURAL CALCULATIONS FOR THIS PROJECT. 11. SHEET S1.0; PLAN NOTES: PLEASE DELETE NOTE 1. 12. SHEET S1.0; FOUNDATION KEYNOTES: PLEASE FINISH NOTES 1, 2, 3, AND 6. 13. SHEET S1.0; FOUNDATION PLAN 1: PLEASE COMPLETE THE SECTION CUT. 14. SHEET S1.0; FRAMING KEYNOTES: PLEASE FINISH NOTE 5. 15. SHEET S1.1; DETAIL 2: THE 1'-6" FOUNDATION DEPTH MUST BE MEASURED FROM THE LOWEST CONCRETE SLAB ELEVATION. PLEASE INDICATE. 16. SHEET S1.1; DETAIL 4: THE 1'-6" FOUNDATION DEPTH MUST BE MEASURED FROM THE LOWEST SLAB OR GRADE ELEVATION. PLEASE INDICATE. 17. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 04/05/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 04/17/2017 | GERRY KOZIOL | WWM | REVIEW | Approved |