Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM01818
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/07/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET g1.2; CODE ANALYSIS: PLEASE INDICATE ON THE DRAWINGS THE SQUARE FOOTAGE FOR EACH BUILDING. 2. SHEET g1.2; CODE ANALYSIS: THE ANALYSIS INDICATES A DRINKING FOUNTAIN IS REQUIRED AND PROVIDED. WHERE IS THIS LOCATED ON SHEET a1.0? IT MUST BE A HIGH/LOW DRINKING FOUNTAIN OR A SINGLE POINT OF USE WATER DISPENSER. PLEASE NOTE. 3. SHEET x1.1; RAMP PLAN: PLEASE INDICATE ON THIS PLAN THE ELEVATIONS OF THE SLAB AT THE DOOR AND AT THE BRICK WALKWAY. 4. SHEET x1.1; RAMP DETAIL 1: PLEASE INDICATE THE SLOPE OF THE RAMP ON THIS DETAIL (SEE IBC SECTION 1010). 5. SHEET x1.1; RAMP DETAIL 2: PLEASE INDICATE THE CROSS SLOPE OF THE RAMP ON THIS DETAIL (SEE IBC SECTION 1010). 6. SHEET x1.1; RAMP DETAIL 2: PLEASE INDICATE ON THIS DETAIL THE MAXIMUM AND MINIMUM DISTANCES FROM THE TOP OF THE RAMP SLAB TO THE ADJACENT GRADE (INDICATES 'VARIES'). 7. SHEET a9.0; DETAIL 10: PLEASE INDICATE THE NUMBER AND SIZE OF CONNECTORS FOR METAL STUDS TO METAL STUDS. 8. SHEET a9.1; DETAIL 7: PLEASE INDICATE THE NUMBER AND SIZE OF CONNECTORS FOR METAL STUDS TO METAL STUDS. 9. SHEET p3.0; DETAIL 3: PLEASE EXTEND THE DETAIL UP TO INDICATE HOW THE ALL THREAD ROD THAT SUPPORTS THE NEW HOT WATER HEATER IS CONNECTED TO THE STRUCTURE ABOVE. 10. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 03/07/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 03/07/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | PLEASE PROVIDE A COMPLETE PANEL SCHEDULES FOR THE PANELS P1, P4. REF; 2012 IBC 107.2.1, 2011 NEC |
| 03/07/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 03/07/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 03/08/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 03/08/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
| 03/08/2017 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 03/17/2017 | KROBLES1 | WWM | REVIEW | Needs Review | |
| 03/17/2017 | KROBLES1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |