Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM01685
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/02/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
03/02/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. 2. Verify that the specified HVAC systems are provided with controls that are capable of automatically adjusting the start time of the HVAC equipment in order to bring the interior conditions to the desired temperature at the start of occupancy. Reference: Section C403.2.4.3.3, IECC 2012. 3. Show how the HVAC controls are capable of reducing the outside air to the minimum flow rates required by Chapter 4, IMC 2012. Reference: Section C403.2.5, IECC 2012. 4. Clarify how excess outside air relief from the building is to be accomplished without recirculation. Reference: Section C403.3.1.1.4, IECC 2012. 5. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restroom will be exhausted (i.e. all of the air supplied to the restroom is to be exhausted during the hours of operation even if the lights are off). The exhausted air from the restrooms shall be limited to no more than 10% of any subsequent supply air stream. Reference: Section 403.2.1 (4), IMC 2012. |
03/02/2017 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
03/02/2017 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved | |
03/02/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
03/02/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
03/02/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Verify that tempered water is being provided for the lavatory using a device conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. |
03/02/2017 | KKARSEN1 | FIRE | REVIEW | Needs Review | |
03/02/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
03/02/2017 | GERRY KOZIOL | WWM | REVIEW | Completed | P17WX00522 |